Permit: TC-COM-0823-02054
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
8690 E GOLF LINKS RD
Address NEW:
8690 E GOLF LINKS RD
Apply Date:
08/23/2023
Applicant:
Brandy Burke
Description:
THE PROPOSED PROJECT IS FOR A NEW SELF-SERVICE DRIVE THRU CAR WASH FACILITY AND EXTERIOR VACUUM ARCHES AT DEDICATED PARKING SPACES. THE BUILDING HAS BEEN DESIGNED TO CONTAIN ALL CAR WASHING AND VACUUM MOTOR EQUIPMENT INSIDE TO MITIGATE VISUAL AND NOISE IMPACTS.
Permit Reviews
Permit Number - TC-COM-0823-02054
Permit Status: Complete
Permit Description: THE PROPOSED PROJECT IS FOR A NEW SELF-SERVICE DRIVE THRU CAR WASH FACILITY AND EXTERIOR VACUUM ARCHES AT DEDICATED PARKING SPACES. THE BUILDING HAS BEEN DESIGNED TO CONTAIN ALL CAR WASHING AND VACUUM MOTOR EQUIPMENT INSIDE TO MITIGATE VISUAL AND NOISE IMPACTS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/06/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/04/2023 | REQUIRES RESUBMIT |
| 10/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/22/2024 | REQUIRES RESUBMIT |
| 01/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 01/07/2025 | APPROVED |
| 03/13/2024 | COMMERCIAL REVIEW - FULL v.1 | 04/12/2024 | REQUIRES RESUBMIT |
| 10/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/01/2024 | APPROVED |
| 12/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2024 | APPROVED |
| 04/19/2024 | COMMERCIAL REVIEW - FULL v.2 | 05/09/2024 | APPROVED |
| 01/11/2024 | COMMERCIAL REVIEW - FULL v.4 | 01/11/2024 | IN REVIEW |
| 02/01/2024 | COMMERCIAL REVIEW - FULL v.5 | 02/08/2024 | APPROVED |
| 11/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/04/2024 | REQUIRES RESUBMIT |
| 12/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 12/23/2024 | REQUIRES RESUBMIT |
| 11/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/06/2024 | REQUIRES RESUBMIT |
| 08/24/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/24/2023 | REQUIRES RESUBMIT |
| 02/08/2024 | RESTAMP - COMMERCIAL v.1 | 02/12/2024 | APPROVED |
| 05/09/2024 | RESTAMP - COMMERCIAL v.1 | 05/13/2024 | APPROVED |
| 01/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/09/2025 | APPROVED |
| 11/22/2023 | COMMERCIAL REVIEW - FULL v.3 | 12/20/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0823-02054
Permit Status: Complete
Permit Description: THE PROPOSED PROJECT IS FOR A NEW SELF-SERVICE DRIVE THRU CAR WASH FACILITY AND EXTERIOR VACUUM ARCHES AT DEDICATED PARKING SPACES. THE BUILDING HAS BEEN DESIGNED TO CONTAIN ALL CAR WASHING AND VACUUM MOTOR EQUIPMENT INSIDE TO MITIGATE VISUAL AND NOISE IMPACTS.
| Date | Description | Comments |
|---|---|---|
| 11/04/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 02/07/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 11/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/23/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/07/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 02/07/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 02/07/2024 | Masonry Inspection Report submittal review is required. | |
| 02/07/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
| 02/07/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 02/07/2024 | Please submit a separate sign permit for an signs associated with this projet. | |
| 08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/01/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 02/07/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 02/07/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 02/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 02/07/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02054
Permite Description: THE PROPOSED PROJECT IS FOR A NEW SELF-SERVICE DRIVE THRU CAR WASH FACILITY AND EXTERIOR VACUUM ARCHES AT DEDICATED PARKING SPACES. THE BUILDING HAS BEEN DESIGNED TO CONTAIN ALL CAR WASHING AND VACUUM MOTOR EQUIPMENT INSIDE TO MITIGATE VISUAL AND NOISE IMPACTS.
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| PDSD Heavy Commercial Building Division Pre-Construction Meeting | N/A | Requested | ||
| 05/23/2024 | COT - HCBU - Preslab | N/A | Partial Pass | 5/23/24: partial for interior car wash |
| 07/01/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 7/1/24: East wall at exit tunnel 12' to 16', West end wall 8' to 12' okay to grout. |
| 06/12/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 6/12/24: Cages and PVC Piping for canopy footings at vacuum area are complete. Ufer ground has been installed to center column footing for entire canopy. Okay to pour concrete. |
| 09/11/2024 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
| 10/21/2024 | COT - HCBU - Interior Shear Bracing | N/A | Not Applicable | Not required--all interior walls are CMU Block walls. |
| 10/21/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Not required--no gas onsite. |
| 10/21/2024 | COT - HCEL - Electrical Progress | N/A | Partial Pass | Electrical trim-out ongoing, electrical power was connected on 10/18/24. |
| 11/04/2024 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to remove the fence that’s on the south east corner of the property and remove all building material around the building Per Josh G okay for Level 4 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02054
Permit Description: THE PROPOSED PROJECT IS FOR A NEW SELF-SERVICE DRIVE THRU CAR WASH FACILITY AND EXTERIOR VACUUM ARCHES AT DEDICATED PARKING SPACES. THE BUILDING HAS BEEN DESIGNED TO CONTAIN ALL CAR WASHING AND VACUUM MOTOR EQUIPMENT INSIDE TO MITIGATE VISUAL AND NOISE IMPACTS.
Total Completed Inspections - 32
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2024 | COT - HCPL - Rough Soil | Passed | 5/14/24: okay to back fill underground plumbing | |
| 05/15/2024 | COT - HCPL - Sewer | Passed | ||
| 05/29/2024 | COT - HCEL - Grounding/Bonding | Passed | Footings are dug for light pole bases, rebar reinforcement is properly in place, and Ufer ground is is ran to the bottom of footings. Okay to pour concrete. | |
| 05/29/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Footings are dug for light pole bases, rebar reinforcement is properly in place, and Ufer ground is is ran to the bottom of footings. Okay to pour concrete. | |
| 06/03/2024 | COT - HCBU - Preslab | Passed | 6/3/24: Slab is complete for interior car wash and office areas. Okay to proceed. | |
| 06/21/2024 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
| 07/03/2024 | COT - HCBU - Masonry Pregrout | Passed | 7/3/24: Grid line 5 from grid line a through c okay to grout. | |
| 07/11/2024 | COT - HCBU - Building Progress | Passed | 7/11/24: wash mat topped out 8' to 12', inner office wall 14'-16' cap and grout, north office wall from 24' to26' okay to grout and cap, exit of Carwash 12'to 16' cap grout. | |
| 07/11/2024 | COT - HCPL - Yard Water Line | Passed | ||
| 07/24/2024 | COT - HCEL - Electrical Underground | Passed | 7/24/24: Rebar Cages and PVC Piping for 14 canopy footings at vacuum area next to building are complete. Ufer ground has been installed to center column footing for entire canopy. Okay to pour concrete. | |
| 08/30/2024 | COT - HCPL - Plumbing Roof Drains | Passed | Roof drains are properly installed and under a water pressure test with no leaks. | |
| 09/09/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 09/09/2024 | COT - HCBU - Framing | Passed | 9/9/24: Framing is complete in bathroom & office area. | |
| 09/09/2024 | COT - HCBU - Roof Nailing | Passed | Metal roof deck is properly screwed off. | |
| 10/01/2024 | BULD - Electrical Clearance | Passed | Approved new 3-phase 1000A service panel - ECO Clearance to TEP is required | |
| 10/07/2024 | COT - HCEL - Electrical Intermediate | Passed | 10/7/24: All sub-panels are wired and torqued from service entrance. Electricians are pulling wire from equipment, lighting, and outlets to sub-panels and making up connections to the breakers. | |
| 10/21/2024 | COT - HCPL - Plumbing Intermediate | Passed | Complete | |
| 10/21/2024 | COT - HCPL - Plumbing Progress | Passed | Complete | |
| 10/21/2024 | COT - HCME - Venting | Passed | Venting to outside thru roof for vacuum equipment. | |
| 10/21/2024 | COT - HCME - Mechanical Progress | Passed | Complete | |
| 10/21/2024 | COT - HCME - Mechanical Intermediate | Passed | Complete | |
| 10/21/2024 | COT - HCME - Mechanical Above Ceiling | Passed | Mechanical work in office area. | |
| 10/25/2024 | COT - HCEL - Electrical Above Ceiling | Passed | 10/25/24: Electrical trim out complete. Okay to proceed with installation of grid ceiling. | |
| 10/28/2024 | TRSP - ROW - Final/Close-Out | Passed | all work complete, final sweep of area and dome covers to be removed for final cleanup | |
| 10/29/2024 | COT - FCON - Fire - Final | Passed | ||
| 10/30/2024 | COT - HCEL - Electrical Final | Passed | Electrical work is complete throughout building, electrical panels are properly labeled, all cover plates are installed, all light switches and electrical outlets are operational. | |
| 10/30/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 10/30/2024 | COT - HCME - Mechanical Final | Passed | Mini-split in office ceiling is operating properly. | |
| 12/13/2024 | COT - HCPL - Plumbing Final | Passed | Plumbing fixtures are installed and fully functional. Water is connected to meter and chlorination testing has been performed. Okay to issue Certificate of Occupancy for this permit. | |
| 12/13/2024 | COT - HCBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Okay to issue Level 4 Certificate of Occupancy. | |
| 01/13/2025 | ENGR Engineering Final | Passed | ||
| 01/13/2025 | COT - HCBU - CofO | Passed | All construction is complete. Okay to issue Permanent Certificate of Occupancy for this project. |