Permit: TC-COM-0823-02017
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2121 N CRAYCROFT RD
Address NEW:
2121 N CRAYCROFT RD
Apply Date:
08/18/2023
Applicant:
Brad Hoge
Description:
New four story slab-on-grade, wood framed building with single ply membrane roof. Automatic sprinkler system is provided per NFPA 13 standards. Building is used for guestrooms, registration. laundry, and mechanical and electrical rooms. Stair enclosures are protected by two-hour rated, interior separation. Accessible rooms are located on the first through fourth floors. The roofing is class "B." Fire detection system (detectors, alarms & sprinklers are included).
Permit Reviews
Permit Number - TC-COM-0823-02017
Permit Status: Complete
Permit Description: New four story slab-on-grade, wood framed building with single ply membrane roof. Automatic sprinkler system is provided per NFPA 13 standards. Building is used for guestrooms, registration. laundry, and mechanical and electrical rooms. Stair enclosures are protected by two-hour rated, interior separation. Accessible rooms are located on the first through fourth floors. The roofing is class "B." Fire detection system (detectors, alarms & sprinklers are included).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/22/2024 | RESTAMP - COMMERCIAL v.1 | 12/02/2024 | APPROVED |
| 07/25/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 07/30/2025 | APPROVED |
| 12/18/2023 | RESTAMP - COMMERCIAL v.1 | 12/19/2023 | APPROVED |
| 11/21/2023 | COMMERCIAL REVIEW - FULL v.3 | 12/18/2023 | APPROVED |
| 07/07/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 07/15/2025 | REQUIRES RESUBMIT |
| 12/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/06/2025 | APPROVED |
| 08/18/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/18/2023 | REQUIRES RESUBMIT |
| 08/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/07/2025 | APPROVED |
| 07/30/2025 | RESTAMP - COMMERCIAL v.1 | 08/04/2025 | APPROVED |
| 10/06/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/31/2023 | REQUIRES RESUBMIT |
| 07/15/2024 | RESTAMP - COMMERCIAL v.1 | 07/16/2024 | APPROVED |
| 11/21/2024 | COMMERCIAL REVIEW - FULL REVISION v.2 | 11/22/2024 | APPROVED |
| 07/10/2024 | COMMERCIAL REVIEW - FULL v.2 | 07/15/2024 | APPROVED |
| 10/08/2024 | COMMERCIAL REVIEW - FULL REVISION v.1 | 11/14/2024 | REQUIRES RESUBMIT |
| 05/15/2024 | COMMERCIAL REVIEW - FULL v.1 | 06/06/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0823-02017
Permit Status: Complete
Permit Description: New four story slab-on-grade, wood framed building with single ply membrane roof. Automatic sprinkler system is provided per NFPA 13 standards. Building is used for guestrooms, registration. laundry, and mechanical and electrical rooms. Stair enclosures are protected by two-hour rated, interior separation. Accessible rooms are located on the first through fourth floors. The roofing is class "B." Fire detection system (detectors, alarms & sprinklers are included).
| Date | Description | Comments |
|---|---|---|
| 11/27/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 11/27/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/27/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/16/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 08/07/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 11/27/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 11/27/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 11/27/2023 | Masonry Inspection Report submittal review is required. | |
| 11/27/2023 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 12/19/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 11/27/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 11/27/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 11/27/2023 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. | |
| 11/27/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02017
Permite Description: New four story slab-on-grade, wood framed building with single ply membrane roof. Automatic sprinkler system is provided per NFPA 13 standards. Building is used for guestrooms, registration. laundry, and mechanical and electrical rooms. Stair enclosures are protected by two-hour rated, interior separation. Accessible rooms are located on the first through fourth floors. The roofing is class "B." Fire detection system (detectors, alarms & sprinklers are included).
Total Outstanding Inspections - 18
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2024 | COT - HCPL - Sewer | N/A | Partial Pass | Sewer good to backfill from previously inspected area to next manhole. |
| 04/19/2024 | COT - HCME - Mechanical Progress | N/A | Not Ready | |
| 05/06/2024 | COT - HCBU - Preslab | N/A | Not Ready | |
| 09/27/2024 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | North, south, east, and west sides of building with scaffolding the plywood is properly nailed off. Okay to proceed with dry in of exterior walls. |
| 11/27/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | DWV on test for, 3rd floor. Units 315, 316, 317, 318, 319, 321, 323. 4th floor. Units 415, 416, 417, 418, 419, 421, 423. Okay to proceed progress areas. 11/27/2024 |
| 05/01/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | UG plumbing. |
| 06/10/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | North side light poles. |
| 01/30/2025 | COT - HCBU - Framing | N/A | Partial Pass | South entry canopy. |
| 01/30/2025 | COT - HCBU - Roof Nailing | N/A | Partial Pass | South entry canopy. |
| 06/25/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | Pole bases |
| 10/29/2024 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | Looked at hold-down on Level Three. |
| 04/01/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | Levels Three and Four, Electrical and Building above ceiling. |
| 04/01/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | Level Three. |
| 04/01/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | Level Three. |
| 08/06/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 08/06/2025 | COT - HCBU - CofO | N/A | Not Ready | |
| 08/06/2025 | COT - HCBU - Building Final | N/A | Partial Pass | |
| 08/06/2025 | COT - HCEL - Outdoor Lighting | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-02017
Permit Description: New four story slab-on-grade, wood framed building with single ply membrane roof. Automatic sprinkler system is provided per NFPA 13 standards. Building is used for guestrooms, registration. laundry, and mechanical and electrical rooms. Stair enclosures are protected by two-hour rated, interior separation. Accessible rooms are located on the first through fourth floors. The roofing is class "B." Fire detection system (detectors, alarms & sprinklers are included).
Total Completed Inspections - 37
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/05/2024 | COT - HCPL - Sewer | Passed | ||
| 04/10/2024 | zzzPDSD Building Division - Site Excavation/Layout/Rebar | Passed | 4/10/24: Rebar reinforcement is properly installed and supported with dobies off the ground. Sleeves are installed for sewer line down hallway. Okay to pour concrete for footings. | |
| 05/08/2024 | COT - HCBU - Preslab | Passed | ||
| 06/05/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 08/30/2024 | COT - HCBU - Masonry Pregrout | Passed | ||
| 10/03/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 11/18/2024 | COT - HCEL - Electrical Intermediate | Passed | 11/18/24: Electrical above ceiling in each room is roughed in on levels 1 through 4. Okay to proceed with ceiling drywall installation in these areas. | |
| 11/18/2024 | COT - HCME - Mechanical Intermediate | Passed | 4/18/24: Fire caulking is complete on 3rd & 4th floor, bathroom exhaust fans are installed and properly ducted to exterior vent stack. Okay to proceed with drywall installation in bathrooms and living areas. | |
| 12/20/2024 | COT - HCPL - Plumbing Intermediate | Passed | Domestic water. | |
| 02/06/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 02/27/2025 | COT - HCPL - Plumbing Progress | Passed | DWV in staff and public laundries. | |
| 02/27/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 03/10/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 04/02/2025 | COT - HCBU - Framing | Passed | ||
| 04/02/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 04/02/2025 | COT - HCEL - Grounding/Bonding | Passed | ||
| 04/02/2025 | COT - HCPL - Rough Soil | Passed | ||
| 04/11/2025 | COT - HCPL - Gas Pressure Test | Passed | ||
| 04/10/2025 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 05/05/2025 | COT - HCBU - Building Progress | Passed | Washing machine platform -Pre-slab. | |
| 05/20/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 05/21/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 05/21/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 05/21/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 07/10/2025 | COT - HCPL - Plumbing Final | Passed | Good for Level One TCO. | |
| 07/10/2025 | COT - HCEL - Electrical Final | Passed | ||
| 07/22/2025 | COT - FCON - Alarm - Final | Passed | ||
| 08/06/2025 | COT - FCON - Fire - Final | Passed | ||
| 08/06/2025 | ENGR Engineering Final | Passed | CO Ready on building only. It is still strongly suggested to cap all 1" condensation drain pipes with some type of bug screen. | |
| 08/06/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/06/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 08/06/2025 | COT - HCME - Mechanical Final | Passed | ||
| 08/06/2025 | COT - HCPL - Plumbing Roof Drains | Passed | ||
| 08/07/2025 | COT - HCBU - CofO | Passed | ||
| 08/07/2025 | COT - HCBU - Building Final | Passed | ||
| 08/07/2025 | COT - HCEL - Outdoor Lighting | Passed |