Permit: TC-COM-0823-01965
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2222 S CRAYCROFT RD BLDG 2
Address NEW:
2222 S CRAYCROFT RD BLDG 2
Apply Date:
08/11/2023
Applicant:
Amanda Jensen
Description:
Phased interior renovation of existing bank annex to a new Autism Center.
Permit Reviews
Permit Number - TC-COM-0823-01965
Permit Status: Complete
Permit Description: Phased interior renovation of existing bank annex to a new Autism Center.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/05/2024 | REQUIRES RESUBMIT |
| 06/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/11/2024 | APPROVED |
| 08/15/2023 | COMMERCIAL REVIEW - FULL v.2 | 09/14/2023 | REQUIRES RESUBMIT |
| 10/10/2023 | RESTAMP - COMMERCIAL v.1 | 10/12/2023 | APPROVED |
| 01/09/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/07/2024 | APPROVED |
| 06/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/17/2024 | APPROVED |
| 08/11/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/11/2023 | REQUIRES RESUBMIT |
| 09/25/2023 | COMMERCIAL REVIEW - FULL v.3 | 10/10/2023 | APPROVED |
| 05/30/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/31/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0823-01965
Permit Status: Complete
Permit Description: Phased interior renovation of existing bank annex to a new Autism Center.
| Date | Description | Comments |
|---|---|---|
| 06/04/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 03/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/05/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 03/05/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 05/30/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01965
Permite Description: Phased interior renovation of existing bank annex to a new Autism Center.
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2023 | COT - HCEL - Electrical Progress | N/A | Partial Pass | OK to one-side Southwest wing. |
| 12/13/2023 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 12/13/23: men's and girls bathroom underground plumbing okay to cover |
| 12/01/2023 | COT - HCBU - Framing | N/A | Partial Pass | OK to one-side Southwest wing. |
| 03/13/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | |
| 05/17/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 03/07/2024 | COT - FCON - Sprinkler - Final | N/A | Partial Pass | Phase 1 only approved. |
| 03/13/2024 | COT - HCME - Mechanical Progress | N/A | Not Ready | |
| 03/07/2024 | COT - HCPL - Plumbing Final | N/A | Partial Pass | 2/26/24: Level 4 TCO phase2 |
| 05/31/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 03/07/2024 | COT - HCME - Mechanical Final | N/A | Partial Pass | 2/26/24: Level 4 TCO phase2 |
| 03/20/2024 | ENGR Engineering Final | N/A | Not Ready | Recall for Monday, Move Porta Jon to contractor area. Have tenant move storage boxes off of site. Cut branches up off of ground to be able to park a van under the tree. Clear branch from in front of of drive line parking sign. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01965
Permit Description: Phased interior renovation of existing bank annex to a new Autism Center.
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2024 | COT - HCEL - Electrical Progress | Passed | 1-3-2024: Rough-in of electrical conduit, outlet boxes, and light switches is complete. Okay to proceed with drywall installation on other side. | |
| 01/03/2024 | COT - HCPL - Plumbing Progress | Passed | 1-3-2024: Rough-in of plumbing in walls & above ceiling for supply lines and DWV is complete. Okay to proceed with drywall installation on other side. | |
| 01/03/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | 1-3-2024: Rough-in of plumbing in walls & above ceiling for supply lines and DWV is complete. Okay to proceed with drywall installation on other side. | |
| 01/03/2024 | COT - HCEL - Electrical Above Ceiling | Passed | 1-3-2024: Rough-in of electrical conduit, outlet boxes, and light switches is complete. Okay to proceed with drywall installation on other side. | |
| 01/03/2024 | COT - HCPL - Plumbing Intermediate | Passed | 1-3-2024: Rough-in of plumbing in walls & above ceiling for supply lines and DWV is complete. Okay to proceed with drywall installation on other side. | |
| 01/30/2024 | COT - HCBU - Building Final | Passed | ||
| 02/15/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 03/07/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/13/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 04/12/2024 | COT - HCBU - Framing | Passed | Framing rough in complete on phase 2. Okay to install drywall. | |
| 04/12/2024 | COT - HCEL - Electrical Intermediate | Passed | 4/12/24: Electrical rough in complete on phase 2. Okay to install drywall. | |
| 05/17/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 05/17/2024 | COT - HCBU - Building Progress | Passed | ||
| 05/17/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 05/29/2024 | COT - FCON - Alarm - Final | Passed | ||
| 05/29/2024 | COT - FCON - Fire - Final | Passed | ||
| 05/29/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 05/29/2024 | COT - HCEL - Electrical Final | Passed | ||
| 05/29/2024 | COT - HCME - Mechanical Progress | Passed | ||
| 05/29/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 05/31/2024 | COT - HCME - Mechanical Final | Passed | ||
| 06/03/2024 | COT - HCBU - TCO | Passed | 6/3/24: Construction, mechanical, and electrical work is complete per plans on Phase Two. Okay to issue Certificate of Completion or Certificate of Occupancy for project/permit. | |
| 06/03/2024 | ENGR Engineering Final | Passed | Everything looks good on the engineering side for a full CO |