Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
08/03/2023
Applicant:
Gene Goldstein
Description:
New Commercial Shell building for future Starbucks

Permit Reviews

Permit Number - TC-COM-0823-01893
Permit Status: Issued
Permit Description: New Commercial Shell building for future Starbucks
Start Date Submittal Complete Date Status  
08/04/2023 COMMERCIAL REVIEW - FULL v.1 09/07/2023 REQUIRES RESUBMIT Review Details
01/29/2024 RESTAMP - COMMERCIAL v.1 01/30/2024 APPROVED Review Details
02/07/2024 RESTAMP - COMMERCIAL v.1 02/09/2024 APPROVED Review Details
03/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2024 APPROVED Review Details
01/26/2024 COMMERCIAL REVIEW - FULL v.5 01/29/2024 APPROVED Review Details
10/23/2023 COMMERCIAL REVIEW - FULL v.2 11/06/2023 REQUIRES RESUBMIT Review Details
01/22/2024 COMMERCIAL REVIEW - FULL v.3 01/24/2024 REQUIRES RESUBMIT Review Details
01/24/2024 COMMERCIAL REVIEW - FULL v.4 01/24/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0823-01893
Permit Status: Issued
Permit Description: New Commercial Shell building for future Starbucks
Total Outstanding Activity Conditions - 15
Date Name
10/30/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
10/30/2023 Masonry Inspection Report submittal review is required.
10/30/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
10/30/2023 WATER STERILIZATION REPORT IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
10/30/2023 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Conditions

Permit Number - TC-COM-0823-01893
Permit Status: Issued
Permit Description: New Commercial Shell building for future Starbucks
Date Description Comments
08/04/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
08/04/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/04/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0823-01893
Permite Description: New Commercial Shell building for future Starbucks
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
02/27/2024 COT - HCPL - Plumbing Progress N/A Partial Pass 2/27/24: 10' of 2" copper piping for main water line at building. 5' going up wall and other 5' in trench. Under pressure ok to proceed and backfill progress areas.
04/17/2024 COT - HCBU - Interior Shear Bracing N/A Not Ready
04/17/2024 COT - BULD - SWG Clearance N/A Not Ready
04/17/2024 COT - HCPL - Plumbing Roof Drains N/A Not Applicable
04/09/2024 COT - HCBU - Framing N/A Partial Pass exterior shear.
08/09/2024 COT - HCEL - Electrical Intermediate N/A Not Ready scheduled to get an Electric Underground inspection which was not on the permit.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0823-01893
Permit Description: New Commercial Shell building for future Starbucks
Total Completed Inspections - 13
Date Description Inspector Results Comments
02/12/2024 COT - HCPL - Sewer Passed
02/20/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
02/20/2024 COT - HCEL - Grounding/Bonding Passed
04/17/2024 COT - HCBU - Exterior Clips/Sheathing Passed
04/17/2024 COT - HCBU - Roof Nailing Passed
04/17/2024 COT - HCME - Mechanical Intermediate Passed
04/17/2024 COT - HCME - Venting Passed
04/17/2024 COT - HCPL - Rough Soil Passed
04/17/2024 COT - HCBU - Preslab Passed
04/24/2024 PDSD Building Division - Site Excavation/Layout/Rebar Passed 4/24/24: drive way signage directional footings okay to place concrete.
06/10/2024 COT - HCPL - Yard Water Line Passed 6/10/24: 40' of 2" pvc pipe is attached to the 5' of copper pipe in main water supply line trench from building to street. Line is under pressure. Contractor will be pouring pad for backflow preventer and then requesting City Water to connect water line to meter and installing backflow preventer.
09/18/2024 COT - HCBU - Framing Passed
09/19/2024 COT - HCEL - Electrical Underground Passed

Documents

File Name Document Type  
SBUX 6210 TRUSS PACKAGE - ENNOVATIVE REVIEWED AND NOTED_V1.PDF DOCUMENTS VIEW
SBUX 6210 TRUSS PACKAGE - ENNOVATIVE REVIEWED AND NOTED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLAN SET WITH CORRECTED ADDRESS_V1.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V3.PDF DOCUMENTS VIEW
1_STRUC CALCS_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW