Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0823-01893
Permit Details
Apply Date:
08/03/2023
Applicant:
Lisa Bowers
Description:
New Commercial Shell building for future Starbucks
Permit Reviews
Permit Number - TC-COM-0823-01893
Permit Status: Issued
Permit Description: New Commercial Shell building for future Starbucks
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/04/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/07/2023 | REQUIRES RESUBMIT |
01/29/2024 | RESTAMP - COMMERCIAL v.1 | 01/30/2024 | APPROVED |
11/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/08/2024 | APPROVED |
02/07/2024 | RESTAMP - COMMERCIAL v.1 | 02/09/2024 | APPROVED |
03/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/20/2024 | APPROVED |
01/26/2024 | COMMERCIAL REVIEW - FULL v.5 | 01/29/2024 | APPROVED |
10/23/2023 | COMMERCIAL REVIEW - FULL v.2 | 11/06/2023 | REQUIRES RESUBMIT |
01/22/2024 | COMMERCIAL REVIEW - FULL v.3 | 01/24/2024 | REQUIRES RESUBMIT |
01/24/2024 | COMMERCIAL REVIEW - FULL v.4 | 01/24/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0823-01893
Permit Status: Issued
Permit Description: New Commercial Shell building for future Starbucks
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
10/30/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. |
10/30/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
10/30/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
10/30/2023 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0823-01893
Permit Status: Issued
Permit Description: New Commercial Shell building for future Starbucks
Date | Description | Comments |
---|---|---|
08/04/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
10/30/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/04/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
10/30/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/30/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
10/30/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
10/30/2023 | Masonry Inspection Report submittal review is required. | |
11/08/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
08/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/30/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
10/30/2023 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
10/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
10/30/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0823-01893
Permite Description: New Commercial Shell building for future Starbucks
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/17/2024 | COT - HCPL - Plumbing Roof Drains | N/A | Not Applicable | |
04/09/2024 | COT - HCBU - Framing | N/A | Partial Pass | exterior shear. |
08/09/2024 | COT - HCEL - Electrical Intermediate | N/A | Not Ready | scheduled to get an Electric Underground inspection which was not on the permit. |
11/12/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required | |
11/12/2024 | COT - HCBU - Interior Shear Bracing | N/A | Not Applicable | |
11/12/2024 | COT - HCBU - Sustainability | N/A | Not Applicable | |
PDSD Heavy Commercial Building Division Pre-Construction Meeting | N/A | Requested |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0823-01893
Permit Description: New Commercial Shell building for future Starbucks
Total Completed Inspections - 28
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/12/2024 | COT - HCPL - Sewer | Passed | ||
02/20/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
02/20/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
04/17/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
04/17/2024 | COT - HCBU - Roof Nailing | Passed | ||
04/17/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
04/17/2024 | COT - HCME - Venting | Passed | ||
04/17/2024 | COT - HCPL - Rough Soil | Passed | ||
04/17/2024 | COT - HCBU - Preslab | Passed | ||
04/24/2024 | PDSD Building Division - Site Excavation/Layout/Rebar | Passed | 4/24/24: drive way signage directional footings okay to place concrete. | |
06/10/2024 | COT - HCPL - Yard Water Line | Passed | 6/10/24: 40' of 2" pvc pipe is attached to the 5' of copper pipe in main water supply line trench from building to street. Line is under pressure. Contractor will be pouring pad for backflow preventer and then requesting City Water to connect water line to meter and installing backflow preventer. | |
09/18/2024 | COT - HCBU - Framing | Passed | ||
09/19/2024 | COT - HCEL - Electrical Underground | Passed | ||
10/04/2024 | BULD - Electrical Clearance | Passed | Meter box, switch gear, disconnects, and sub-panels are installed and properly wired. ECO Clearance issued. Okay to energize. | |
10/08/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
10/09/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 10/8/24: rebar for light pole base is to schedule and underground electrical okay to pour concrete light pole south east corner of parking lot | |
10/09/2024 | COT - HCPL - Plumbing Intermediate | Passed | 10/9/24: final for shell building | |
10/09/2024 | COT - HCPL - Plumbing Final | Passed | 10/9/24: final for shell building | |
10/09/2024 | COT - HCPL - Plumbing Progress | Passed | ||
10/09/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter connection only | |
10/28/2024 | COT - HCEL - Electrical Final | Passed | ||
10/28/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
11/12/2024 | COT - FCON - Fire - Final | Passed | ||
11/12/2024 | ENGR Engineering Final | Passed | Passed is the building shell only, the DP still needs to be reinspected and passed for ITDG to be completed with this site. | |
11/12/2024 | COT - HCBU - Building Progress | Passed | ||
11/12/2024 | COT - HCME - Mechanical Final | Passed | ||
11/12/2024 | COT - HCME - Mechanical Progress | Passed | ||
11/12/2024 | COT - HCBU - Building Final | Passed |