Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0725-01297
Permit Details
Apply Date:
07/03/2025
Applicant:
Kelly Rehm
Description:
The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
Permit Reviews
Permit Number - TC-COM-0725-01297
Permit Status: Inspections
Permit Description: The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/07/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/28/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0725-01297
Permit Status: Inspections
Permit Description: The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
| Date | Description | Comments |
|---|---|---|
| 07/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0725-01297
Permite Description: The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2025 | COT - CSOL - Electrical Underground Solar Project | N/A | Partial Pass | Building E to D |