Permit Details

Status:
Awaiting Customer Attention
Type:
Commercial Building
Address:
455 E WETMORE RD
Address NEW:
455 E WETMORE RD
Apply Date:
07/23/2024
Applicant:
Annie Behring
Description:
This is a large-scale expansion, that will take this existing Walmart to a super center. In order to do that we will expand into some of the existing stores in the shopping center. The Development Package review number tied to this submittal is TD-DEV-0324-00096.

Permit Reviews

Permit Number - TC-COM-0724-01409
Permit Status: Awaiting customer attention
Permit Description: This is a large-scale expansion, that will take this existing Walmart to a super center. In order to do that we will expand into some of the existing stores in the shopping center. The Development Package review number tied to this submittal is TD-DEV-0324-00096.
Start Date Submittal Complete Date Status  
03/27/2026 ADMINISTRATIV v.1 03/27/2026 REQUIRES RESUBMIT Review Details
03/06/2025 COMMERCIAL REVIEW - FULL v.4 03/07/2025 APPROVED Review Details
12/10/2025 COMMERCIAL REVIEW - FULL REVISION v.1 01/05/2026 REQUIRES RESUBMIT Review Details
12/31/2024 COMMERCIAL REVIEW - FULL v.2 01/23/2025 REQUIRES RESUBMIT Review Details
05/01/2025 COMMERCIAL REVIEW - FULL v.1 05/29/2025 REQUIRES RESUBMIT Review Details
08/21/2025 RESTAMP - COMMERCIAL v.1 08/22/2025 APPROVED Review Details
07/03/2025 COMMERCIAL REVIEW - FULL v.2 07/07/2025 REQUIRES RESUBMIT Review Details
03/13/2026 COMMERCIAL REVIEW - FULL REVISION v.2 N/A APPROVED Review Details
03/19/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2025 APPROVED Review Details
08/19/2025 COMMERCIAL REVIEW - FULL v.3 08/21/2025 APPROVED Review Details
07/24/2024 COMMERCIAL REVIEW - FULL v.1 08/26/2024 REQUIRES RESUBMIT Review Details
02/05/2025 COMMERCIAL REVIEW - FULL v.3 02/21/2025 REQUIRES RESUBMIT Review Details
03/07/2025 RESTAMP - COMMERCIAL v.1 03/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0724-01409
Permit Status: Awaiting customer attention
Permit Description: This is a large-scale expansion, that will take this existing Walmart to a super center. In order to do that we will expand into some of the existing stores in the shopping center. The Development Package review number tied to this submittal is TD-DEV-0324-00096.
Total Outstanding Activity Conditions - 12
Date Name
01/16/2025 Prior to project being finalized applicant must provide documentation that the 10' Natural Gas Easement has been abandoned prior to final CofO.
03/07/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
03/07/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/07/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/07/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/07/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/07/2025 Masonry Inspection Report submittal review is required.
03/07/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/07/2025 SPECIAL INSPECTION FOR WELDING IS REQUIRED.
03/17/2026 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
03/17/2026 An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
07/02/2025 ENTITLEMENTS CONDITIONS

Conditions

Permit Number - TC-COM-0724-01409
Permit Status: Awaiting customer attention
Permit Description: This is a large-scale expansion, that will take this existing Walmart to a super center. In order to do that we will expand into some of the existing stores in the shopping center. The Development Package review number tied to this submittal is TD-DEV-0324-00096.
Date Description Comments
07/23/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
07/23/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/05/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/31/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/07/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Awaiting Customer Attention
Permit Number: TC-COM-0724-01409
Permite Description: This is a large-scale expansion, that will take this existing Walmart to a super center. In order to do that we will expand into some of the existing stores in the shopping center. The Development Package review number tied to this submittal is TD-DEV-0324-00096.
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
04/24/2025 COT - HCBU - Preslab N/A Not Ready
04/24/2025 COT - BULD - SWG Clearance N/A Not Applicable
05/08/2025 COT - HCBU - Masonry Pregrout N/A Not Ready
10/27/2025 COT - HCPL - Rough Soil N/A Not Ready
07/17/2025 COT - HCEL - Electrical Progress N/A Not Ready
02/05/2026 COT - HCEL - Electrical Underground N/A Partial Pass
02/13/2026 ENGR Engineering Final N/A Not Ready Per communication with Gustavo Armenta, additional work required prior to expansion of TCO area.
02/19/2026 COT - FCON - Fire - Final N/A Partial Pass Level 3 TCO for the following areas:
-Automotive/Sporting Goods area in rear of existing store.
-New entrance vestibule and extension up to new plastic wall.
02/19/2026 COT - HCBU - Building Progress N/A Partial Pass 2/19/26: hard duct approved in break room, all joints have been properly sealed and hard duct is properly supported. (Pending SA and RA registers at ceiling grid), partial for brake room
11/20/2025 COT - HCBU - Framing N/A Partial Pass GM loading dock and break room, walk dairy cooler, Ice cream and meat coolers, EDC 4.
02/19/2026 COT - HCEL - Electrical Above Ceiling N/A Partial Pass 2/19/26: Electrical above ceiling approved in break room.
02/25/2026 COT - HCBU - Building Above Ceiling N/A Not Ready
02/18/2026 COT - HCBU - TCO N/A Not Ready
03/16/2026 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass DWV on test deli prep area approved.
Mechanical room #2 Rear grocery area water lines approved. Up to rear maintenance closet. 3/16/2026
03/16/2026 COT - HCME - Mechanical Above Ceiling N/A Partial Pass 3/16/2026 Mechanical units numbered. 29 back of house 28,27,23,1.
03/16/2026 COT - HCPL - Plumbing Intermediate N/A Partial Pass DWV on test deli prep area approved.
Mechanical room #2 Rear grocery area water lines approved. Up to rear maintenance closet. 3/16/2026
12/23/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass
11/24/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Not Ready

Completed Inspections

Permit Status: Awaiting Customer Attention
Permit Number: TC-COM-0724-01409
Permit Description: This is a large-scale expansion, that will take this existing Walmart to a super center. In order to do that we will expand into some of the existing stores in the shopping center. The Development Package review number tied to this submittal is TD-DEV-0324-00096.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/02/2025 COT - HCPL - Plumbing Progress Passed
03/27/2026 Building Inspection - Outside Normal Hours Building Inspection Passed Passed CLEARANCE INCR 3/27/26 CALLED TEP AFTER HOURS 2:27am
03/27/2026 BULD - Electrical Clearance Passed Passed CLEARANCE INCR 3/27/26 CALLED TEP AFTER HOURS 2:27am

Documents

File Name Document Type  
CONS-WM01325 TUCSON, AZ - CCD9 - CCD10 PLANS_V2.PDF DOCUMENTS VIEW
NARRATIVE - CCDS 9 - 10 - 01325_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REVISED WALMART PLANS - 8.19.25_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TC-COM-0724-01409_WALMART 1325 - EXPANSION - SIGNED-2025-03-18_V1.PDF DOCUMENTS VIEW
CONS-REVISED WALMART PLANS - 1.30.25_V4.PDF DOCUMENTS VIEW
01325 TUCSON, AZ WALMART EXPANSION - STRUCTURAL CALCULATIONS - FLATTENED_V1.PDF DOCUMENTS VIEW
1325 - ANCHOR CALCS_V2.PDF DOCUMENTS VIEW
1325 - GEOTECH REPORT_V1_V2.PDF DOCUMENTS VIEW
1325 - REVISED UTILITY PLAN_V2.PDF DOCUMENTS VIEW
1325 TUCSON AZ EXPANSION MODEL CHARACTERISTIC 2016 (WMV1.04)_V2.PDF DOCUMENTS VIEW
ENERGY COMPLIANCE REPORT 1325 TUCSON AZ EXPANSION ECB METHOD - ASHRAE 90.1-2016 (WMV1.01).XLSM_V2.PDF DOCUMENTS VIEW