Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
07/16/2024
Applicant:
Edward Yunkherr
Description:
TI: Restaurant for Rock N Roll Sushi

Permit Reviews

Permit Number - TC-COM-0724-01375
Permit Status: Complete
Permit Description: TI: Restaurant for Rock N Roll Sushi
Start Date Submittal Complete Date Status  
08/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/07/2025 APPROVED Review Details
11/19/2024 COMMERCIAL REVIEW - FULL v.2 11/29/2024 REQUIRES RESUBMIT Review Details
12/13/2024 RESTAMP - COMMERCIAL v.1 01/13/2025 APPROVED Review Details
07/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/04/2025 REQUIRES RESUBMIT Review Details
12/12/2024 COMMERCIAL REVIEW - FULL v.3 12/13/2024 APPROVED Review Details
07/17/2024 COMMERCIAL REVIEW - FULL v.1 08/19/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0724-01375
Permit Status: Complete
Permit Description: TI: Restaurant for Rock N Roll Sushi
Date Description Comments
07/17/2024 Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512
07/29/2024 AIR BALANCING REPORT IS REQUIRED.
07/17/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/12/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0724-01375
Permite Description: TI: Restaurant for Rock N Roll Sushi
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/16/2025 ENGR Engineering Final N/A Not Applicable Interior TI, no exterior work.
COT - FCON - Fire - Final N/A Not Ready
COT - FCON - Hood System - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0724-01375
Permit Description: TI: Restaurant for Rock N Roll Sushi
Total Completed Inspections - 23
Date Description Inspector Results Comments
01/27/2025 COT - HCPL - Rough Soil Passed Underground plumbing is complete and under water test. Okay to shade pipes and backfill trenches.
04/29/2025 COT - HCBU - Framing Passed
04/29/2025 COT - HCPL - Gas Pressure Test Passed
06/17/2025 BULD - Electrical Clearance Passed Clearance for TEP ECO. SUITE 151. 6/17/2025
07/16/2025 COT - BULD - SWG Clearance Passed 7-16-25: okay for SWG to install meter. Clearance issued.
07/25/2025 COT - HCBU - Building Above Ceiling Passed
07/25/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed 7/25/25
Pass
07/25/2025 COT - HCEL - Electrical Above Ceiling Passed 7/25/25
Pass
07/25/2025 COT - HCEL - Electrical Intermediate Passed 7/25/25
Pass
07/25/2025 COT - HCME - Mechanical Above Ceiling Passed 7/25/25
Pass
07/25/2025 COT - HCME - Mechanical Intermediate Passed 7/25/25
Pass
07/25/2025 COT - HCPL - Plumbing Above Ceiling Passed 7/25/25
Passed
07/25/2025 COT - HCPL - Plumbing Intermediate Passed 7/25/25
Passed
07/25/2025 TRSP - ROW - Final/Close-Out Passed Work completed on private property
07/25/2025 COT - HCEL - Electrical Final Passed
07/25/2025 COT - HCME - Mechanical Final Passed
07/25/2025 COT - HCPL - Plumbing Final Passed
08/01/2025 COT - FCON - Sprinkler - Final Passed
08/06/2025 COT - FCON - Fire - Final Passed
08/06/2025 COT - FCON - Hood System - Final Passed
08/06/2025 COT - HCPL - Gas Final Passed
08/06/2025 COT - HCBU - Building Final Passed Approved. 8/6/2025
08/06/2025 COT - HCBU - CofO Passed