Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
3955 E BROADWAY BL
Apply Date:
07/15/2024
Applicant:
Edward Yunkherr
Description:
New Drive through only coffee and smoothie shop.

Permit Reviews

Permit Number - TC-COM-0724-01364
Permit Status: Complete
Permit Description: New Drive through only coffee and smoothie shop.
Start Date Submittal Complete Date Status  
06/18/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/18/2026 APPROVED Review Details
10/14/2024 RESTAMP - COMMERCIAL v.1 11/13/2024 APPROVED Review Details
06/11/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/12/2026 APPROVED Review Details
06/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/13/2026 APPROVED Review Details
07/13/2026 SPECIAL INSPECTION REVIEW v.1 07/16/2026 APPROVED Review Details
07/16/2024 COMMERCIAL REVIEW - FULL v.1 08/16/2024 REQUIRES RESUBMIT Review Details
05/20/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/21/2026 APPROVED Review Details
09/13/2024 COMMERCIAL REVIEW - FULL v.2 10/14/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0724-01364
Permit Status: Complete
Permit Description: New Drive through only coffee and smoothie shop.
Date Description Comments
09/25/2024 AIR BALANCING REPORT IS REQUIRED.
09/25/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/08/2026 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
09/25/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/25/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
07/16/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/25/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/25/2024 SPECIAL INSPECTION FOR Structural Steel IS REQUIRED
09/25/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/25/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0724-01364
Permite Description: New Drive through only coffee and smoothie shop.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
08/26/2025 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass main building only; canopy not constructed.
10/23/2025 COT - HCEL - Electrical Above Ceiling N/A Partial Pass Drive through canopy
06/11/2026 TRSP - ROW - Final/Close-Out N/A Re-inspection required
07/13/2026 COT - HCBU - Building Final N/A Partial Pass 7/8/26: OKAY TO APPLY FOR LEVEL 4 TCO (SIC's pending for permit close-out).

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0724-01364
Permit Description: New Drive through only coffee and smoothie shop.
Total Completed Inspections - 24
Date Description Inspector Results Comments
07/02/2025 COT - HCPL - Rough Soil Passed 7-2-25: underground plumbing approved. Okay to backfill with shading materials.
07/09/2025 COT - HCBU - Preslab Passed
08/26/2025 COT - HCBU - Roof Nailing Passed
10/01/2025 COT - HCEL - Electrical Intermediate Passed
10/01/2025 COT - HCPL - Plumbing Intermediate Passed
10/01/2025 COT - HCME - Mechanical Intermediate Passed
10/01/2025 COT - HCBU - Framing Passed Ok to insulate and sheet rock throughout.
10/01/2025 COT - HCPL - Sewer Passed
10/01/2025 COT - HCPL - Plumbing Above Ceiling Passed
10/01/2025 COT - HCME - Mechanical Above Ceiling Passed
10/20/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
05/01/2026 BULD - Electrical Clearance Passed Passed 5/1/26 CLEARANCE ECO
05/18/2026 COT - HCBU - Exterior Clips/Sheathing Passed
05/18/2026 COT - HCBU - Building Above Ceiling Passed
05/18/2026 ENGR Engineering Final Passed Site is complete and ready for public access.
05/20/2026 COT - HCEL - Electrical Above Ceiling Passed
05/20/2026 COT - HCEL - Outdoor Lighting Passed
05/20/2026 COT - HCPL - Yard Water Line Passed
05/20/2026 COT - FCON - Fire - Final Passed
06/09/2026 COT - HCPL - Plumbing Final Passed
06/09/2026 COT - HCME - Mechanical Final Passed
06/09/2026 COT - HCEL - Grounding/Bonding Passed
06/09/2026 COT - HCEL - Electrical Final Passed
07/16/2026 COT - HCBU - Building Final Passed