Permit Details

Status:
Complete
Type:
Commercial Building
Address:
4202 E 22ND ST
Address NEW:
4202 E 22ND ST
Apply Date:
07/26/2023
Applicant:
Kyle Vilaubi
Description:
New Shell Building for future Starbucks

Permit Reviews

Permit Number - TC-COM-0723-01819
Permit Status: Complete
Permit Description: New Shell Building for future Starbucks
Start Date Submittal Complete Date Status  
07/27/2023 COMMERCIAL REVIEW - FULL v.1 09/01/2023 REQUIRES RESUBMIT Review Details
12/19/2023 RESTAMP - COMMERCIAL v.1 12/20/2023 APPROVED Review Details
07/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/17/2024 APPROVED Review Details
12/18/2023 RESTAMP - COMMERCIAL v.1 12/19/2023 IN REVIEW Review Details
11/21/2023 COMMERCIAL REVIEW - FULL v.2 12/18/2023 APPROVED Review Details
08/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/16/2024 APPROVED Review Details
08/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/08/2024 APPROVED Review Details
03/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/25/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0723-01819
Permit Status: Complete
Permit Description: New Shell Building for future Starbucks
Date Description Comments
08/08/2024 SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED.
07/27/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/08/2024 SPECIAL INSPECTION FOR EARTHWORK IS REQUIRED.
08/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/08/2024 SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED.
08/08/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0723-01819
Permite Description: New Shell Building for future Starbucks
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
05/14/2024 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Applicable
07/11/2024 COT - HCME - Venting N/A Not Applicable
PDSD Heavy Commercial Building Division Pre-Construction Meeting N/A Requested
COT - FCON - Fire - Final N/A Not Ready
07/16/2024 COT - HCME - Mechanical Final N/A Re-inspection required Install roof access ladder.
07/24/2024 ENGR Engineering Final N/A Not Ready There are a few items that need to be redone.
1) ADA ramp from parking area needs to be one pitch from flat to flat.
2) ADA also needs to have rails on both sides of lower and one side of upper.
3) There is a dbl pitch in the patio area going to the walkway that needs to also to be redone.
4) Short term bike parking needs to be a 6' slab so the bikes won't impede the walkway.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0723-01819
Permit Description: New Shell Building for future Starbucks
Total Completed Inspections - 35
Date Description Inspector Results Comments
02/14/2024 COT - HCPL - Rough Soil Passed Grease interceptor is installed and connected to underground plumbing. Underground plumbing is installed and under a water test with no leaks. Okay to backfill trenches and grease interceptor.
02/21/2024 COT - HCEL - Grounding/Bonding Passed Ufer ground wire is properly secured to the bottom 20' piece of rebar reinforcement. Okay to cover with concrete.
02/21/2024 COT - HCEL - Electrical Underground Passed Electrical conduit for underground electrical is properly installed for electrical and communication wiring. Okay to backfill trenches.
03/07/2024 COT - HCBU - Preslab Passed
04/12/2024 COT - HCBU - Framing Passed Metal stud framing complete for exterior walls, wood framing partially completed for parapet walls around roof. Exterior sheathing for shear wall is properly screwed to studs at 7" on edge and 12" in field.
04/16/2024 COT - HCBU - Roof Nailing Passed Ok to,dry in roof system.
04/22/2024 COT - HCBU - Exterior Clips/Sheathing Passed Exterior shear walls are properly secured to metal studs at 7" on edge and 12" in the field. Okay to proceed with window installation and dry-in of exterior walls for stucco application.
05/13/2024 COT - HCEL - Outdoor Lighting Passed Not ready for this inspection, needed rebar and footing inspection for light pole bases.
05/13/2024 COT - HCBU - Excavation/Rebar/Zoning Passed Footings and rebar for exterior light poles are properly dug, rebar reinforcement cages are installed, and Ufer ground is in place from bottom of footings to top of rebar cage. Okay to pour concrete light pole bases.
05/14/2024 COT - HCPL - Gas Pressure Test Passed
05/16/2024 COT - HCEL - Electrical Progress Passed Ok to insulate and sheet rock interior walls
05/16/2024 COT - HCPL - Plumbing Progress Passed Ok to insulate and sheet rock interior walls.
06/03/2024 BULD - Electrical Clearance Passed
06/04/2024 COT - HCBU - Building Above Ceiling Passed
06/04/2024 COT - HCBU - Building Progress Passed
06/04/2024 COT - HCEL - Electrical Above Ceiling Passed
06/04/2024 COT - HCEL - Electrical Intermediate Passed
06/04/2024 COT - HCME - Mechanical Underground Passed
07/01/2024 COT - HCBU - Masonry Pregrout Passed Trash enclosure and patio area. Okay to fully grout. Top out. 7/1/2024
07/11/2024 TRSP - ROW - Final/Close-Out Passed
07/11/2024 COT - HCEL - Electrical Final Passed
07/11/2024 COT - HCME - Mechanical Intermediate Passed
07/11/2024 COT - HCME - Mechanical Progress Passed
07/11/2024 COT - HCPL - Backwater Valve Passed
07/11/2024 COT - HCPL - Plumbing Above Ceiling Passed
07/11/2024 COT - HCPL - Plumbing Intermediate Passed
07/16/2024 COT - HCPL - Gas Final Passed
07/16/2024 COT - HCPL - Plumbing Final Passed
07/24/2024 COT - BULD - SWG Clearance Passed SWG for meter only
07/24/2024 COT - FCON - Fire - Final Passed
07/24/2024 COT - HCME - Mechanical Above Ceiling Passed
07/24/2024 COT - HCME - Mechanical Final Passed
07/24/2024 COT - HCBU - CofO Passed 7/24/24: shell building completed
08/02/2024 COT - HCBU - Building Final Passed
09/26/2024 ENGR Engineering Final Passed This venue opened on the week of the 16th without a final inspection from engineering. CO is approved it should have been completed prior to the pending and release of the CO.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
TE-FPU-1023-00354.PDF DOCUMENTS VIEW
SBUX 4202 SPECIAL INSPECTION CERTIFICATE-2024-08-02_V1.PDF DOCUMENTS VIEW
INNOVATIVE TECHNOLOGY - STARBUCKS (SHELL) LAB RESULTS-2024-07-15_V1.PDF DOCUMENTS VIEW
SBUX 4202 TRUSS PACKAGE - ENNOVATIVE REVIEWED AND NOTED_V1.PDF DOCUMENTS VIEW
SBUX 4202 TRUSS PACKAGE - ENNOVATIVE REVIEWED AND NOTED_V1_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
2_STRUC CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
2_STRUC CALCS_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
2_STRUC CALCS_V1.PDF DOCUMENTS VIEW
1_STRUC CALCS_V1.PDF DOCUMENTS VIEW
WILLDAN PSA_V1.PDF DOCUMENTS VIEW