Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2024 | ENGR Engineering Final | Not Ready | There are a few items that need to be redone. 1) ADA ramp from parking area needs to be one pitch from flat to flat. 2) ADA also needs to have rails on both sides of lower and one side of upper. 3) There is a dbl pitch in the patio area going to the walkway that needs to also to be redone. 4) Short term bike parking needs to be a 6' slab so the bikes won't impede the walkway. |
|
| 08/01/2024 | ENGR Engineering Final | Partial Pass | This is for the exterior items other than the signage, Menu boards and anything else that will fall under Starbucks themselves. The site fencing and dumpster have been turned over to Starbucks. | |
| 09/26/2024 | ENGR Engineering Final | Passed | This venue opened on the week of the 16th without a final inspection from engineering. CO is approved it should have been completed prior to the pending and release of the CO. |