Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
07/18/2023
Applicant:
Description:
The project is in Pima County but at the Airport which is under the jurisdiction of the COT.

Permit Reviews

Permit Number - TC-COM-0723-01737
Permit Status: Issued
Permit Description: The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Start Date Submittal Complete Date Status  
07/28/2023 COMMERCIAL PDSD SIMPLE REVIEW v.2 08/03/2023 APPROVED Review Details
07/19/2023 COMMERCIAL PDSD SIMPLE REVIEW v.1 07/25/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0723-01737
Permit Status: Issued
Permit Description: The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Date Description Comments
08/03/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0723-01737
Permite Description: The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/09/2023 COT - LCEL - Electrical Underground N/A Not Applicable There is no underground electrical, all wiring is above ground and protected by a wire raceway.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0723-01737
Permit Description: The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/09/2023 COT - LCEL - Grounding/Bonding Passed Generator is in place and wired to all the water pumps for the make-up water, return water, and cooling tower. Ground wires are ran from each piece of equipment for electrical and lightning protection. Okay to energize system when ready.
08/09/2023 COT - LCEL - Electrical Intermediate Passed Generator is in place and wired to all the water pumps for the make-up water, return water, and cooling tower. Ground wires are ran from each piece of equipment for electrical and lightning protection. Okay to energize system when ready.
08/09/2023 COT - LCEL - Electrical Final Passed Generator is in place and wired to all the water pumps for the make-up water, return water, and cooling tower. Ground wires are ran from each piece of equipment for electrical and lightning protection. Okay to energize system when ready.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TIA DYNO COOLING SYSTEM TEMP ELECTRICAL POWER - ELECTRICAL REV 1 SET_V1.PDF DOCUMENTS VIEW