Permit: TC-COM-0723-01737
Permit Details
Apply Date:
07/18/2023
Applicant:
Description:
The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Permit Reviews
Permit Number - TC-COM-0723-01737
Permit Status: Issued
Permit Description: The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/28/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 08/03/2023 | APPROVED |
07/19/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 07/25/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0723-01737
Permit Status: Issued
Permit Description: The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Date | Description | Comments |
---|---|---|
08/03/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0723-01737
Permite Description: The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2023 | COT - LCEL - Electrical Underground | N/A | Not Applicable | There is no underground electrical, all wiring is above ground and protected by a wire raceway. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0723-01737
Permit Description: The project is in Pima County but at the Airport which is under the jurisdiction of the COT.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2023 | COT - LCEL - Grounding/Bonding | Passed | Generator is in place and wired to all the water pumps for the make-up water, return water, and cooling tower. Ground wires are ran from each piece of equipment for electrical and lightning protection. Okay to energize system when ready. | |
08/09/2023 | COT - LCEL - Electrical Intermediate | Passed | Generator is in place and wired to all the water pumps for the make-up water, return water, and cooling tower. Ground wires are ran from each piece of equipment for electrical and lightning protection. Okay to energize system when ready. | |
08/09/2023 | COT - LCEL - Electrical Final | Passed | Generator is in place and wired to all the water pumps for the make-up water, return water, and cooling tower. Ground wires are ran from each piece of equipment for electrical and lightning protection. Okay to energize system when ready. |