Inspection Status: Passed
Inspection History: COT - LCEL - Electrical FinalĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 08/09/2023 |
COT - LCEL - Electrical FinalĀ |
|
Passed |
Generator is in place and wired to all the water pumps for the make-up water, return water, and cooling tower. Ground wires are ran from each piece of equipment for electrical and lightning protection. Okay to energize system when ready. |