Permit Details

Status:
Awaiting Submittal
Type:
Commercial Building
Address NEW:
3338 E FORT LOWELL RD
Apply Date:
06/30/2026
Applicant:
Cameron Graupman
Description:
Construction of a new 1,693 SF restaurant with an additional 1,215 SF of exterior courtyard, new parking lot and landscaping

Permit Reviews

Permit Number - TC-COM-0626-00998
Permit Status: Awaiting submittal
Permit Description: Construction of a new 1,693 SF restaurant with an additional 1,215 SF of exterior courtyard, new parking lot and landscaping
Start Date Submittal Complete Date Status  
07/01/2026 COMMERCIAL REVIEW - FULL v.1 07/24/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0626-00998
Permit Status: Awaiting submittal
Permit Description: Construction of a new 1,693 SF restaurant with an additional 1,215 SF of exterior courtyard, new parking lot and landscaping
Total Outstanding Activity Conditions - 12
Date Name
07/01/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/01/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/23/2026 Prior to Final - Required Documents - AIR BALANCING REPORT IS REQUIRED.
07/23/2026 Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
07/23/2026 SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
07/23/2026 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
07/23/2026 SPECIAL INSPECTION OF MASONRY CONSTRUCTION IS REQUIRED.
07/23/2026 Prior to Issuance - Special Inspections - Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
07/23/2026 SPECIAL INSPECTION OF SOILS IS REQUIRED.
07/23/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
07/23/2026 WATER STERILIZATION REPORT IS REQUIRED.
07/23/2026 SPECIAL INSPECTION OF WOOD CONSTRUCTION IS REQUIRED.