Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/11/2026
Applicant:
Alexander Ehinger
Description:
THE INTERIOR BUILD-OUT OF A MERCANTILE SPACE CONTAINED WITHIN AN EXISTING SHOPPING CENTER. PROPOSED WORK INCLUDES CONSTRUCTION AND INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, FIXTURES, FINISHES, LIGHTING, MECHANICAL, ELECTRICAL, AND PLUMBING.

Permit Reviews

Permit Number - TC-COM-0626-00866
Permit Status: Complete
Permit Description: THE INTERIOR BUILD-OUT OF A MERCANTILE SPACE CONTAINED WITHIN AN EXISTING SHOPPING CENTER. PROPOSED WORK INCLUDES CONSTRUCTION AND INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, FIXTURES, FINISHES, LIGHTING, MECHANICAL, ELECTRICAL, AND PLUMBING.
Start Date Submittal Complete Date Status  
10/20/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/22/2026 APPROVED Review Details
07/20/2026 ADMINISTRATIVE v.1 07/20/2026 REQUIRES RESUBMIT Review Details
06/16/2026 COMMERCIAL REVIEW - FULL v.1 07/09/2026 REQUIRES RESUBMIT Review Details
07/16/2026 COMMERCIAL REVIEW - FULL v.2 07/16/2026 REQUIRES RESUBMIT Review Details
07/16/2026 COMMERCIAL REVIEW - FULL v.3 07/22/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0626-00866
Permit Status: Complete
Permit Description: THE INTERIOR BUILD-OUT OF A MERCANTILE SPACE CONTAINED WITHIN AN EXISTING SHOPPING CENTER. PROPOSED WORK INCLUDES CONSTRUCTION AND INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, FIXTURES, FINISHES, LIGHTING, MECHANICAL, ELECTRICAL, AND PLUMBING.
Date Description Comments
07/08/2026 AIR BALANCING REPORT IS REQUIRED.
06/16/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/16/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/08/2026 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0626-00866
Permite Description: THE INTERIOR BUILD-OUT OF A MERCANTILE SPACE CONTAINED WITHIN AN EXISTING SHOPPING CENTER. PROPOSED WORK INCLUDES CONSTRUCTION AND INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, FIXTURES, FINISHES, LIGHTING, MECHANICAL, ELECTRICAL, AND PLUMBING.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
09/02/2026 COT - LCEL - Electrical Intermediate N/A Not Ready
10/20/2026 BULD - Electrical Clearance N/A Not Applicable 10/20/26: not applicable.
10/20/2026 COT - BULD - SWG Clearance N/A Not Applicable 10/20/26: not applicable.
10/16/2026 COT - FCON - Alarm - Final N/A Re-inspection required Pull station and smoke shall be added.
COT - FCON - Fire - Final N/A Not Ready
10/20/2026 COT - LCME - Mechanical Final N/A Partial Pass 10/20/26: partial pass pending air balance report.
10/20/2026 COT - LCPL - Plumbing Final N/A Partial Pass 10/20/26: partial pass pending water sterilization report.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0626-00866
Permit Description: THE INTERIOR BUILD-OUT OF A MERCANTILE SPACE CONTAINED WITHIN AN EXISTING SHOPPING CENTER. PROPOSED WORK INCLUDES CONSTRUCTION AND INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, FIXTURES, FINISHES, LIGHTING, MECHANICAL, ELECTRICAL, AND PLUMBING.
Total Completed Inspections - 15
Date Description Inspector Results Comments
08/21/2026 COT - LCPL - Rough Soil Passed 8-21-26: underground plumbing verified under test and per approved plans. Okay to backfill using shading materials.
09/02/2026 COT - LCBU - Framing Passed
09/02/2026 COT - LCPL - Plumbing Intermediate Passed
09/03/2026 COT - LCEL - Electrical Intermediate Passed 9-3-26: in wall electrical verified per plans. Okay to continue with construction.
10/15/2026 COT - LCBU - Building Above Ceiling Passed 10/15/26: building above ceiling approved.
10/15/2026 COT - LCME - Mechanical Intermediate Passed 10-15-26: mechanical intermediates approved.
10/15/2026 COT - LCEL - Electrical Above Ceiling Passed 10-15-26: electrical above ceiling approved.
10/16/2026 COT - FCON - Sprinkler - Final Passed Approved on 10/8/2026 on permit TF-FCP-0826-00520
10/20/2026 COT - LCEL - Electrical Final Passed 10/20/26: electrical final approved.
10/21/2026 COT - FCON - Alarm - Final Passed
10/21/2026 COT - FCON - Fire - Final Passed
10/21/2026 COT - LCBU - Building Final Passed 10/21/26: building final approved. All conditions and inspections have been satisfied-okay to apply for a C of O.
10/21/2026 COT - LCME - Mechanical Final Passed 10/21/26: mechanical final approved.
10/21/2026 COT - LCPL - Plumbing Final Passed 10/21/26: plumbing final approved.
10/21/2026 COT - HCBU - TCO Passed 10/21/26: building final approved. All conditions and inspections have been satisfied-okay to apply for a C of O.

Documents

File Name Document Type  
AIR BAL. RPT-2610896-CARHARTT - TUCSON SPECTRUM-2026-10-15_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
FINAL REPORT NC2610-017 SAHARA MECHANICAL-2026-10-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW