Permit: TC-COM-0626-00819
Permit Details
Apply Date:
06/04/2026
Applicant:
David Ely
Description:
Associated with TD-DEV-0626-00141 INSTALL (1) PRE-ASSEMBLED SUPERCHARGER UNITS - (1 TOTAL) SUPERCHARGER CABINETS - (8 TOTAL) SUPERCHARGER POSTS - (1) TESLA SITE CONTROLLER INSTALL (1) SWITCHBOARD ASSEMBLY WITH INTEGRATED TESLA SITE CONTROLLER AND PRIMARY BROADCAST UNIT · INSTALL (1) UTILITY TRANSFORMER, (1) METER, AND OTHER ASSOCIATED UTILITY EQUIPMENT · INSTALL (2) POLE MOUNTED LUMINAIRES· FUTURE (1) SUPERCHARGER CABINETS· FUTURE (8) SUPERCHARGER POSTS
Permit Reviews
Permit Number - TC-COM-0626-00819
Permit Status: In review
Permit Description: Associated with TD-DEV-0626-00141
INSTALL (1) PRE-ASSEMBLED SUPERCHARGER UNITS - (1 TOTAL) SUPERCHARGER CABINETS - (8 TOTAL) SUPERCHARGER POSTS - (1) TESLA SITE CONTROLLER INSTALL (1) SWITCHBOARD ASSEMBLY WITH INTEGRATED TESLA SITE CONTROLLER AND
PRIMARY BROADCAST UNIT · INSTALL (1) UTILITY TRANSFORMER, (1) METER, AND OTHER ASSOCIATED UTILITY EQUIPMENT · INSTALL (2) POLE MOUNTED LUMINAIRES· FUTURE (1) SUPERCHARGER CABINETS· FUTURE (8) SUPERCHARGER POSTS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/09/2026 | COMMERCIAL REVIEW - FULL v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-COM-0626-00819
Permit Status: In review
Permit Description: Associated with TD-DEV-0626-00141
INSTALL (1) PRE-ASSEMBLED SUPERCHARGER UNITS - (1 TOTAL) SUPERCHARGER CABINETS - (8 TOTAL) SUPERCHARGER POSTS - (1) TESLA SITE CONTROLLER INSTALL (1) SWITCHBOARD ASSEMBLY WITH INTEGRATED TESLA SITE CONTROLLER AND
PRIMARY BROADCAST UNIT · INSTALL (1) UTILITY TRANSFORMER, (1) METER, AND OTHER ASSOCIATED UTILITY EQUIPMENT · INSTALL (2) POLE MOUNTED LUMINAIRES· FUTURE (1) SUPERCHARGER CABINETS· FUTURE (8) SUPERCHARGER POSTS
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/09/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 06/29/2026 | SPECIAL INSPECTION OF CAST-IN-PLACE DEEP FOUNDATION ELEMENTS IS REQUIRED. |
| 06/29/2026 | SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED. |
| 06/29/2026 | SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. |
| 06/29/2026 | SPECIAL INSPECTION OF SOILS IS REQUIRED. |
| 06/29/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Conditions
Permit Number - TC-COM-0626-00819
Permit Status: In review
Permit Description: Associated with TD-DEV-0626-00141
INSTALL (1) PRE-ASSEMBLED SUPERCHARGER UNITS - (1 TOTAL) SUPERCHARGER CABINETS - (8 TOTAL) SUPERCHARGER POSTS - (1) TESLA SITE CONTROLLER INSTALL (1) SWITCHBOARD ASSEMBLY WITH INTEGRATED TESLA SITE CONTROLLER AND
PRIMARY BROADCAST UNIT · INSTALL (1) UTILITY TRANSFORMER, (1) METER, AND OTHER ASSOCIATED UTILITY EQUIPMENT · INSTALL (2) POLE MOUNTED LUMINAIRES· FUTURE (1) SUPERCHARGER CABINETS· FUTURE (8) SUPERCHARGER POSTS
| Date | Description | Comments |
|---|---|---|
| 06/09/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |