Permit Details

Status:
Complete
Type:
Commercial Building
Address:
270 S STONE AV
Address NEW:
270 S STONE AV
Apply Date:
06/25/2025
Applicant:
Architecture & Engineering City of Tucson
Description:
Convert Existing Information Technology Space to Open Plan Offices

Permit Reviews

Permit Number - TC-COM-0625-01231
Permit Status: Complete
Permit Description: Convert Existing Information Technology Space to Open Plan Offices
Start Date Submittal Complete Date Status  
11/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/26/2025 APPROVED Review Details
06/26/2025 COMMERCIAL REVIEW - FULL v.1 07/02/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0625-01231
Permit Status: Complete
Permit Description: Convert Existing Information Technology Space to Open Plan Offices
Date Description Comments
06/27/2025 AIR BALANCING REPORT IS REQUIRED.
06/26/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0625-01231
Permite Description: Convert Existing Information Technology Space to Open Plan Offices
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
09/19/2025 BULD - Electrical Clearance N/A Not Applicable
09/19/2025 COT - BULD - SWG Clearance N/A Not Applicable
COT - FCON - Alarm - Final N/A Not Ready
09/19/2025 COT - FCON - Fire - Final N/A Re-inspection required Fire sprinklers shall be evatuated by a licensed sprinkler contractor.
09/19/2025 COT - FCON - Sprinkler - Final N/A Re-inspection required Fire sprinklers shall be evatuated by a licensed sprinkler contractor.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0625-01231
Permit Description: Convert Existing Information Technology Space to Open Plan Offices
Total Completed Inspections - 8
Date Description Inspector Results Comments
09/19/2025 TRSP - ROW - Final/Close-Out Passed
09/19/2025 ENGR Engineering Final Passed
09/19/2025 COT - LCPL - Plumbing Final Passed
09/19/2025 COT - LCME - Mechanical Final Passed
09/19/2025 COT - LCEL - Electrical Final Passed
09/23/2025 COT - LCBU - Building Final Passed Approved. Corrections were made. 9/23/2025
11/19/2025 COT - FCON - Fire - Final Passed
11/19/2025 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
TPD HQ T.I. OFFICE SPACE - TAB REPORT - SPACE FLOOR PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TPD HQ CSARC TI CIP-0824-00026 100 COMBINED PLANS REV1 5-29-25_V1.PDF DOCUMENTS VIEW