Permit: TC-COM-0625-01151
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
5530 E BROADWAY BL
Address NEW:
5530 E BROADWAY BL
Apply Date:
06/12/2025
Applicant:
Heather Newman
Description:
Interior Remodel, Including Interior Partitions, New Lighting, New Ceiling, New Kitchenette and Associated MEP Systems
Permit Reviews
Permit Number - TC-COM-0625-01151
Permit Status: In review
Permit Description: Interior Remodel, Including Interior Partitions, New Lighting, New Ceiling, New Kitchenette and Associated MEP Systems
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | IN REVIEW |
| 11/20/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/24/2025 | APPROVED |
| 09/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/05/2025 | APPROVED |
| 07/30/2025 | COMMERCIAL REVIEW - FULL v.2 | 07/30/2025 | REQUIRES RESUBMIT |
| 07/31/2025 | COMMERCIAL REVIEW - FULL v.3 | 08/22/2025 | APPROVED |
| 06/18/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/09/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0625-01151
Permit Status: In review
Permit Description: Interior Remodel, Including Interior Partitions, New Lighting, New Ceiling, New Kitchenette and Associated MEP Systems
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/19/2025 | SPECIAL INSPECTION OF ALL ANCHORS AND/OR CONNECTIONS INSTALLED IN CONCRETE MASONRY UNIT WALLS. |
Conditions
Permit Number - TC-COM-0625-01151
Permit Status: In review
Permit Description: Interior Remodel, Including Interior Partitions, New Lighting, New Ceiling, New Kitchenette and Associated MEP Systems
| Date | Description | Comments |
|---|---|---|
| 07/08/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 06/18/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/08/2025 | NESHAP Permit is required. (Utilized with commercial demolition permits) | |
| 08/19/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-0625-01151
Permite Description: Interior Remodel, Including Interior Partitions, New Lighting, New Ceiling, New Kitchenette and Associated MEP Systems
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2025 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | Refuse enclosure, footer: dimensions and reinforcement are good. Okay to pour. |
| 10/06/2025 | COT - LCBU - Masonry Pregrout | N/A | Canceled | wanted dumpster enclosure |
| 10/09/2025 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 10/28/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 10/28/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/13/2025 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
| COT - HCBU - TCO | N/A | Scheduled | ||
| COT - LCBU - Building Final | N/A | Scheduled |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-0625-01151
Permit Description: Interior Remodel, Including Interior Partitions, New Lighting, New Ceiling, New Kitchenette and Associated MEP Systems
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 09/29/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | looked at structural components of footing; requested builder to schedule with engineering group. Also looked at electric intermediate at offices; requested builder to schedule. | |
| 10/01/2025 | COT - LCBU - Framing | Passed | ||
| 10/07/2025 | COT - LCPL - Rough Soil | Passed | ||
| 10/07/2025 | For trash and recycling enclosures | Passed | 10/7/25 Bond beam in with 2 #4 bond beam in place. Horizontal reinforcement correct. Okay to pour grout to bond beam and finish wall. |
|
| 10/10/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 10/23/2025 | COT - LCEL - Electrical Intermediate | Passed | Passed final 10/23/25 | |
| 10/29/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 11/05/2025 | COT - FCON - Alarm - Final | Passed | ||
| 12/09/2025 | COT - LCPL - Plumbing Final | Passed | Passed 12/9/25 | |
| 12/09/2025 | COT - LCME - Mechanical Final | Passed | Passed 12/9/25 | |
| 12/09/2025 | COT - LCEL - Electrical Final | Passed | Passed 12/9/25 | |
| 12/09/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 12/09/2025 | COT - FCON - Fire - Final | Passed |
Scheduled Inspections
Scheduled Inspections - TC-COM-0625-01151
Status: In Review
Description: Interior Remodel, Including Interior Partitions, New Lighting, New Ceiling, New Kitchenette and Associated MEP Systems
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 12/15/2025 | COT - HCBU - TCO | Scheduled | |
| 12/15/2025 | COT - LCBU - Building Final | Scheduled |