Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2025 | For trash and recycling enclosures | Partial Pass | Okay to grout lower half then stack to full height. | |
| 10/07/2025 | For trash and recycling enclosures | Passed | 10/7/25 Bond beam in with 2 #4 bond beam in place. Horizontal reinforcement correct. Okay to pour grout to bond beam and finish wall. |