Permit: TC-COM-0625-01144
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
10042 E OLD VAIL RD UNIT 140
Address NEW:
10042 E OLD VAIL RD UNIT 140
Apply Date:
06/11/2025
Applicant:
Miles Hadlock
Description:
Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
Permit Reviews
Permit Number - TC-COM-0625-01144
Permit Status: Complete
Permit Description: Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2025 | COMMERCIAL REVIEW - FULL v.2 | 07/31/2025 | APPROVED |
| 10/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/20/2025 | APPROVED |
| 07/31/2025 | RESTAMP - COMMERCIAL v.1 | 08/04/2025 | APPROVED |
| 06/12/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/03/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0625-01144
Permit Status: Complete
Permit Description: Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
| Date | Description | Comments |
|---|---|---|
| 07/31/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 07/25/2025 | SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED. | |
| 06/12/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/25/2025 | SPECIAL INSPECTION OF SOILS IS REQUIRED. | |
| 07/31/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01144
Permite Description: Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 10-14-25: not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01144
Permit Description: Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2025 | COT - LCPL - Rough Soil | Passed | 8.22.25 Verified via video inspect Approved Ok to backfill |
|
| 08/27/2025 | COT - LCBU - Preslab | Passed | 8-27-25: preslab approved-okay for concrete placement at progress areas. | |
| 09/10/2025 | COT - LCPL - Plumbing Intermediate | Passed | 9-10-25: in wall DWV & domestic verified per plans & under test. Tying in of vents to extend through roof will be verified at above ceiling inspection. Okay to continue construction at progress areas. | |
| 09/10/2025 | COT - LCEL - Electrical Intermediate | Passed | 9-10-25: in wall electrical verified per plans-0kay to,continue with TI at progress areas. | |
| 09/10/2025 | COT - LCBU - Framing | Passed | 9-10-25: framing verified per details. Okay to continue with TI at progress areas. | |
| 10/01/2025 | BULD - Electrical Clearance | Passed | 10/1/25: TEP ECO CLEARANCE FOR 10042 E OLD VAIL RD UNIT 140 panel C | |
| 10/14/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 10-14-25: previously inspected & approved when slab on grade was verified. | |
| 10/14/2025 | COT - LCEL - Grounding/Bonding | Passed | 10-14-25: approved. | |
| 10/14/2025 | COT - LCEL - Electrical Above Ceiling | Passed | 10-14-25: electrical above ceiling approved. | |
| 10/14/2025 | COT - LCME - Mechanical Intermediate | Passed | 10-14-25: mechanical intermediate approved. | |
| 10/14/2025 | COT - LCEL - Electrical Final | Passed | 10-14-25: electrical final approved. | |
| 10/14/2025 | COT - LCME - Mechanical Final | Passed | 10-14-25: mechanical final approved. | |
| 10/16/2025 | COT - FCON - Fire - Final | Passed | ||
| 10/16/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 10/17/2025 | COT - LCBU - Building Final | Passed | 10.17.25 Passed |
|
| 10/17/2025 | COT - LCPL - Plumbing Final | Passed | 10.17.25 Passed |
|
| 10/17/2025 | ENGR Engineering Final | Passed | 10/17/25 Contractor has scheduled portapotty to be removed on Monday 10/20. Connex box is being packed up and will be removed asap and before C of O. There is also a dumpster but that is being kept for the tennant who will be using it for packaging disposal. It will be removed asap when finished. It is located off to the side of the building. |
|
| 10/17/2025 | TRSP - ROW - Final/Close-Out | Passed |