Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/11/2025
Applicant:
Miles Hadlock
Description:
Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.

Permit Reviews

Permit Number - TC-COM-0625-01144
Permit Status: Complete
Permit Description: Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
Start Date Submittal Complete Date Status  
07/10/2025 COMMERCIAL REVIEW - FULL v.2 07/31/2025 APPROVED Review Details
10/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/20/2025 APPROVED Review Details
07/31/2025 RESTAMP - COMMERCIAL v.1 08/04/2025 APPROVED Review Details
06/12/2025 COMMERCIAL REVIEW - FULL v.1 07/03/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0625-01144
Permit Status: Complete
Permit Description: Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
Date Description Comments
07/31/2025 AIR BALANCING REPORT IS REQUIRED.
07/25/2025 SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
06/12/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/25/2025 SPECIAL INSPECTION OF SOILS IS REQUIRED.
07/31/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0625-01144
Permite Description: Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/14/2025 COT - BULD - SWG Clearance N/A Not Applicable 10-14-25: not applicable.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0625-01144
Permit Description: Existing shell building. New professional services office TI including electrical, mechanical, plumbing, LED lighting, millwork and interior finishes.
Total Completed Inspections - 18
Date Description Inspector Results Comments
08/22/2025 COT - LCPL - Rough Soil Passed 8.22.25
Verified via video inspect
Approved
Ok to backfill
08/27/2025 COT - LCBU - Preslab Passed 8-27-25: preslab approved-okay for concrete placement at progress areas.
09/10/2025 COT - LCPL - Plumbing Intermediate Passed 9-10-25: in wall DWV & domestic verified per plans & under test. Tying in of vents to extend through roof will be verified at above ceiling inspection. Okay to continue construction at progress areas.
09/10/2025 COT - LCEL - Electrical Intermediate Passed 9-10-25: in wall electrical verified per plans-0kay to,continue with TI at progress areas.
09/10/2025 COT - LCBU - Framing Passed 9-10-25: framing verified per details. Okay to continue with TI at progress areas.
10/01/2025 BULD - Electrical Clearance Passed 10/1/25: TEP ECO CLEARANCE FOR 10042 E OLD VAIL RD UNIT 140 panel C
10/14/2025 COT - LCBU - Excavation/Rebar/Zoning Passed 10-14-25: previously inspected & approved when slab on grade was verified.
10/14/2025 COT - LCEL - Grounding/Bonding Passed 10-14-25: approved.
10/14/2025 COT - LCEL - Electrical Above Ceiling Passed 10-14-25: electrical above ceiling approved.
10/14/2025 COT - LCME - Mechanical Intermediate Passed 10-14-25: mechanical intermediate approved.
10/14/2025 COT - LCEL - Electrical Final Passed 10-14-25: electrical final approved.
10/14/2025 COT - LCME - Mechanical Final Passed 10-14-25: mechanical final approved.
10/16/2025 COT - FCON - Fire - Final Passed
10/16/2025 COT - FCON - Sprinkler - Final Passed
10/17/2025 COT - LCBU - Building Final Passed 10.17.25
Passed
10/17/2025 COT - LCPL - Plumbing Final Passed 10.17.25
Passed
10/17/2025 ENGR Engineering Final Passed 10/17/25
Contractor has scheduled portapotty to be removed on Monday 10/20. Connex box is being packed up and will be removed asap and before C of O. There is also a dumpster but that is being kept for the tennant who will be using it for packaging disposal. It will be removed asap when finished. It is located off to the side of the building.
10/17/2025 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
25J0303_1 TURNER 10 10 2025 1032-2025-10-16_V1.PDF DOCUMENTS VIEW
ACTION BEHAVIOR CENTERS TUCSON RPT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONSTRUCTION PLANS.V2_V2.PDF DOCUMENTS VIEW
MECHANICAL LOAD CALCS_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTION-2025-06-11_V1.PDF DOCUMENTS VIEW