Permit: TC-COM-0624-01275
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
9210 E VALENCIA RD
Address NEW:
9210 E VALENCIA RD
Apply Date:
06/30/2024
Applicant:
Chris Hayes
Description:
new build of 1 story, 3,380 SF retail bank with attached ATM drive thu and associated site improvements
Permit Reviews
Permit Number - TC-COM-0624-01275
Permit Status: Inspections complete
Permit Description: new build of 1 story, 3,380 SF retail bank with attached ATM drive thu and associated site improvements
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/05/2024 | REQUIRES RESUBMIT |
| 12/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/18/2024 | REQUIRES RESUBMIT |
| 12/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 12/19/2024 | APPROVED |
| 07/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/21/2025 | REQUIRES RESUBMIT |
| 09/24/2024 | RESTAMP - COMMERCIAL v.1 | 09/25/2024 | APPROVED |
| 03/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/14/2025 | APPROVED |
| 09/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/11/2025 | APPROVED |
| 08/22/2024 | COMMERCIAL REVIEW - FULL v.2 | 09/24/2024 | APPROVED |
| 12/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/02/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0624-01275
Permit Status: Inspections complete
Permit Description: new build of 1 story, 3,380 SF retail bank with attached ATM drive thu and associated site improvements
| Date | Description | Comments |
|---|---|---|
| 07/01/2024 | Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512 | |
| 12/02/2024 | SPECIAL INSPECTION OF COLD-FORMED STEEL LIGHT-FRAME CONSTRUCTION IS REQUIRED. | |
| 12/02/2024 | SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED. | |
| 07/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 12/02/2024 | SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. | |
| 12/02/2024 | SPECIAL INSPECTION OF MASONRY CONSTRUCTION IS REQUIRED. | |
| 12/02/2024 | SPECIAL INSPECTION FOR POST-INSTALLED ANCHORS IS REQUIRED. | |
| 12/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/02/2024 | SPECIAL INSPECTION OF SOILS IS REQUIRED. | |
| 08/23/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/02/2024 | SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED. | |
| 03/14/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0624-01275
Permite Description: new build of 1 story, 3,380 SF retail bank with attached ATM drive thu and associated site improvements
Total Outstanding Inspections - 14
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 4-21-25, panel verified as per plans but a moisture barrier is required prior to providing electrical clearance. Reschedule when ready. |
| 05/01/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 4-21-25, Missing anchor bolts at data room-anchor bolts are required within 12" of a splice on each side at on exterior walls. Firefoam any penetration where conduit runs vertically through blocking/ top plates. These items will be verified on next inspection which is scheduled for 4-22-25. Continue marking all junction boxes and verify that all metal boxes are properly grounded. 5/1/25: wanted electrical clearance. |
| 05/15/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 5/15/25: Main water line approved per plans and under 100psi for test, ok to backfill progress areas. Shading required. |
| 02/11/2025 | COT - HCPL - Sewer | N/A | Partial Pass | 2/11/25: Electrical and Plumbing underground at slab passed ok to proceed. |
| 02/12/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 2-12-25, verified rebar as per approved plans on 7 columns. Okay to pour when ready. |
| 04/18/2025 | COT - HCBU - Framing | N/A | Partial Pass | 4-8-25, partial pass- contractor requested a progress inspection for framing-3rd party inspector has been involved for steel/bolt inspections. Framing itself is ongoing and contractor will schedule a framing/roof inspection when complete to verify construction. 4/18/25: partial pass on exterior sheathing ok to proceed |
| 05/29/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 5-29-25: inspected SES/disconnect-verified per plans. |
| 05/01/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 2/11/25: Electrical and Plumbing underground at slab passed ok to proceed. 3/3/25: electrical underground from existing transformer location to south end of building at new transformer location. Ok to backfill progress areas. 3-6-25, no approved set of plans for 4- 4" conduits for new transformer. Attempted to contact Chris but got no answer 1116am. 5/1/25: partial pass for exterior electrical underground for light poles on north half of site approved. |
| 04/24/2025 | COT - HCPL - Plumbing Roof Drains | N/A | Partial Pass | 4-24-25, plumbing roof drains verified under test. Note: Construction is ongoing and you are okay to drywall interior walls up to 8'. I require access to verify that all penetrations are fire foamed & copper lines are insulated. |
| 04/24/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 4-24-25, plumbing verified under test and per plans. Note: Construction is ongoing and you are okay to drywall interior walls up to 8'. I require access to verify that all penetrations are fire foamed at required points. |
| 04/22/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | 4-22-25, partial pass - anchor bolts verified at data room and at shear walls. Lobby framing approved but screws are required plywood above door leading into bathroom area from lobby. All firefoam penetrations to be verified at intermediates, in wall electrical verified, however, above ceiling electrical/plumbing in walls and above ceiling will be verified at later date. Okay to continue construction at progress areas. |
| 09/11/2025 | COT - HCBU - CofO | N/A | Partial Pass | 9/11/25: OKAY FOR LEVEL 4 TCO |
| 09/12/2025 | COT - HCBU - TCO | N/A | Partial Pass | 9/11/25: OKAY FOR LEVEL 4 TCO |
| 08/22/2025 | COT - FCON - Fire - Final | N/A | Re-inspection required | Monitoring permit. Address numbers Approved for TCO level 4 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0624-01275
Permit Description: new build of 1 story, 3,380 SF retail bank with attached ATM drive thu and associated site improvements
Total Completed Inspections - 32
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2025 | COT - HCBU - Preslab | Passed | Forms are set, vapor barrier is installed and wire mesh is installed. Okay to proceed with concrete pour. | |
| 04/16/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 05/02/2025 | COT - HCBU - Interior Shear Bracing | Passed | 5/2/25: passed, ok to proceed with tape and mud | |
| 05/29/2025 | BULD - Electrical Clearance | Passed | 5-29-25: panel is okay to be energized. ECO clearance issued to TEP. | |
| 08/04/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 08/04/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 08/04/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 08/04/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 08/12/2025 | COT - HCPL - Plumbing Final | Passed | 8-12-25; plumbing & electrical finals approved. | |
| 08/20/2025 | COT - HCME - Mechanical Final | Passed | 8/20/2025 approved. Corrections have been made. | |
| 08/20/2025 | COT - HCEL - Electrical Final | Passed | 8/20/2025 approved. Corrections have been made. | |
| 09/10/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 09/10/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 09/10/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 09/10/2025 | COT - HCPL - Sewer | Passed | ||
| 09/10/2025 | COT - HCPL - Rough Soil | Passed | ||
| 09/10/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 09/10/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 09/10/2025 | COT - HCBU - Framing | Passed | ||
| 09/10/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 09/10/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 09/10/2025 | COT - HCEL - Outdoor Lighting | Passed | ||
| 09/10/2025 | COT - HCPL - Plumbing Roof Drains | Passed | ||
| 09/10/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 09/10/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 09/10/2025 | COT - HCBU - Building Progress | Passed | ||
| 10/13/2025 | COT - HCBU - CofO | Passed | ||
| 10/13/2025 | COT - HCBU - TCO | Passed | ||
| 10/10/2025 | COT - FCON - Fire - Final | Passed | ||
| 10/13/2025 | COT - HCBU - Building Final | Passed | ||
| 10/13/2025 | ENGR Engineering Final | Passed | ||
| 10/16/2025 | TRSP - ROW - Final/Close-Out | Passed |