Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
6550 S BAY COLONY DR
Apply Date:
06/06/2023
Applicant:
Daniel Gullick
Description:
TI: Interior, demo existing call center and break room, reconfigure to storage, office, breakroom

Permit Reviews

Permit Number - TC-COM-0623-01445
Permit Status: Complete
Permit Description: TI: Interior, demo existing call center and break room, reconfigure to storage, office, breakroom
Start Date Submittal Complete Date Status  
06/06/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
07/24/2023 RESTAMP - COMMERCIAL v.1 07/25/2023 APPROVED Review Details
02/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/02/2024 APPROVED Review Details
01/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/17/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0623-01445
Permit Status: Complete
Permit Description: TI: Interior, demo existing call center and break room, reconfigure to storage, office, breakroom
Date Description Comments
07/21/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
07/21/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
07/21/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/25/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
07/21/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/21/2023 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
07/21/2023 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
07/21/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0623-01445
Permite Description: TI: Interior, demo existing call center and break room, reconfigure to storage, office, breakroom
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
12/18/2023 BULD - Electrical Clearance N/A Not Applicable
12/18/2023 COT - BULD - SWG Clearance N/A Not Applicable
11/08/2023 COT - HCEL - Electrical Above Ceiling N/A Not Ready
08/29/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass CBR phase 1. Okay for concrete placement in footings. Stopped just before electrical conduits east of pad. Detail 2 on concrete site wall has been red line. Footings was asking for 2’6 red line calls for 6” more. 3’ width. Sump pump basin per plan. Okay for concrete placement. 8/29/2023
10/12/2023 COT - HCPL - Plumbing Above Ceiling N/A Not Ready
12/27/2023 COT - FCON - Alarm - Final N/A Partial Pass
12/27/2023 COT - FCON - Fire - Final N/A Partial Pass Alarm must be passed. Handles removed from back doors.
12/18/2023 COT - HCME - Mechanical Final N/A Partial Pass 12/18/23: mechanical final passed pending Air balance report.
12/18/2023 COT - HCPL - Plumbing Final N/A Partial Pass 12/18/23: plumbing passed pending water sterilization report.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0623-01445
Permit Description: TI: Interior, demo existing call center and break room, reconfigure to storage, office, breakroom
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/22/2023 COT - HCBU - Framing Passed 9/20/23: Electrical rough-in is complete, door frames are installed and properly attached to metal studs. Okay to drywall other side, tape, texture, and paint interior walls.
10/12/2023 COT - HCPL - Rough Soil Passed
11/08/2023 COT - HCPL - Sewer Passed
11/21/2023 COT - HCME - Mechanical Above Ceiling Passed
12/18/2023 COT - HCEL - Electrical Intermediate Passed
12/18/2023 COT - HCBU - Building Above Ceiling Passed
12/18/2023 COT - HCEL - Electrical Above Ceiling Passed
12/18/2023 COT - HCBU - Preslab Passed
12/18/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
12/18/2023 COT - HCBU - Stem Wall/Retaining Wall Passed
12/18/2023 COT - HCME - Mechanical Intermediate Passed
12/18/2023 COT - HCPL - Plumbing Above Ceiling Passed
12/18/2023 COT - HCPL - Plumbing Intermediate Passed
12/27/2023 COT - FCON - Sprinkler - Final Passed
01/11/2024 COT - FCON - Alarm - Final Passed
01/11/2024 COT - FCON - Fire - Final Passed
01/12/2024 TRSP - ROW - Final/Close-Out Passed
01/12/2024 COT - HCEL - Electrical Final Passed
01/12/2024 COT - HCME - Mechanical Final Passed
01/12/2024 COT - HCPL - Plumbing Final Passed
01/17/2024 ENGR Engineering Final Passed
01/18/2024 COT - HCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FINAL SIC-2024-02-01_V1.PDF DOCUMENTS VIEW
DESIGN CONTRACT - GAC BALANCE CERT 01162024_V1.PDF DOCUMENTS VIEW
FIELD SERVICE REPORT - WESTERN WATER TECHNOLOGIES - CBR PHASE 1 - 12-15-23-2024-01-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
CONS-STANTEC_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
STANTEC PSA _V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_SPEC_INSP_CERT_V1.PDF DOCUMENTS VIEW