Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-COM-0623-01445

Parcel: 140420760

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
08/23/2023 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial for interior spread footer 1each
08/29/2023 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass CBR phase 1. Okay for concrete placement in footings. Stopped just before electrical conduits east of pad. Detail 2 on concrete site wall has been red line. Footings was asking for 2’6 red line calls for 6” more. 3’ width. Sump pump basin per plan. Okay for concrete placement. 8/29/2023
11/08/2023 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Dock leveler pit. Detail 16 on S2.1. Site wall at existing conduit detail 15 on S2.1 rebar per plan okay for concrete placement 11/8/2023
11/16/2023 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial for interior spread footer 1each

CBR phase 1. Okay for concrete placement in footings. Stopped just before electrical conduits east of pad. Detail 2 on concrete site wall has been red line. Footings was asking for 2’6 red line calls for 6” more. 3’ width. Sump pump basin per plan. Okay for concrete placement. 8/29/2023

Dock leveler pit. Detail 16 on S2.1. Site wall at existing conduit detail 15 on S2.1 rebar per plan okay for concrete placement 11/8/2023

11/16/23: reinforcement at stem wall per plan for new and storage liquid nitrogen tanks. Ok to pour.
11/22/2023 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Partial for interior spread footer 1each

CBR phase 1. Okay for concrete placement in footings. Stopped just before electrical conduits east of pad. Detail 2 on concrete site wall has been red line. Footings was asking for 2’6 red line calls for 6” more. 3’ width. Sump pump basin per plan. Okay for concrete placement. 8/29/2023

Dock leveler pit. Detail 16 on S2.1. Site wall at existing conduit detail 15 on S2.1 rebar per plan okay for concrete placement 11/8/2023

11/16/23: reinforcement at stem wall per plan for new and storage liquid nitrogen tanks. Ok to pour.

11/22/23: dock leveler pit walls reinforcement per plan ok to pour.
12/18/2023 COT - HCBU - Excavation/Rebar/Zoning  Passed