Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Partial for interior spread footer 1each | |
| 08/29/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | CBR phase 1. Okay for concrete placement in footings. Stopped just before electrical conduits east of pad. Detail 2 on concrete site wall has been red line. Footings was asking for 2’6 red line calls for 6” more. 3’ width. Sump pump basin per plan. Okay for concrete placement. 8/29/2023 | |
| 11/08/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Dock leveler pit. Detail 16 on S2.1. Site wall at existing conduit detail 15 on S2.1 rebar per plan okay for concrete placement 11/8/2023 | |
| 11/16/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Partial for interior spread footer 1each CBR phase 1. Okay for concrete placement in footings. Stopped just before electrical conduits east of pad. Detail 2 on concrete site wall has been red line. Footings was asking for 2’6 red line calls for 6” more. 3’ width. Sump pump basin per plan. Okay for concrete placement. 8/29/2023 Dock leveler pit. Detail 16 on S2.1. Site wall at existing conduit detail 15 on S2.1 rebar per plan okay for concrete placement 11/8/2023 11/16/23: reinforcement at stem wall per plan for new and storage liquid nitrogen tanks. Ok to pour. |
|
| 11/22/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Partial for interior spread footer 1each CBR phase 1. Okay for concrete placement in footings. Stopped just before electrical conduits east of pad. Detail 2 on concrete site wall has been red line. Footings was asking for 2’6 red line calls for 6” more. 3’ width. Sump pump basin per plan. Okay for concrete placement. 8/29/2023 Dock leveler pit. Detail 16 on S2.1. Site wall at existing conduit detail 15 on S2.1 rebar per plan okay for concrete placement 11/8/2023 11/16/23: reinforcement at stem wall per plan for new and storage liquid nitrogen tanks. Ok to pour. 11/22/23: dock leveler pit walls reinforcement per plan ok to pour. |
|
| 12/18/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed |