Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0623-01422
Permit Details
Apply Date:
06/01/2023
Applicant:
Cary Broschat
Description:
relocation of existing solar canopy system 210.6 DC KW
Permit Reviews
Permit Number - TC-COM-0623-01422
Permit Status: Complete
Permit Description: relocation of existing solar canopy system 210.6 DC KW
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/13/2024 | APPROVED |
02/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/29/2024 | APPROVED |
06/02/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/06/2023 | APPROVED |
02/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/26/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0623-01422
Permit Status: Complete
Permit Description: relocation of existing solar canopy system 210.6 DC KW
Date | Description | Comments |
---|---|---|
07/27/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
07/27/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
07/27/2023 | SPECIAL INSPECTION FOR SPECIAL MOMENT-RESISTING CONCRETE FRAME IS REQUIRED. | |
07/27/2023 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
02/12/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
07/27/2023 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | |
07/27/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01422
Permite Description: relocation of existing solar canopy system 210.6 DC KW
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/03/2024 | COT - CSOL - Grounding/Bonding Solar Project | N/A | Partial Pass | |
01/24/2024 | COT - CSOL - Electrical Underground Solar Project | N/A | Partial Pass | Partial approval. For canopy A and B. bore holes. Okay to backfill. Shading required. 1/24/24 |
02/12/2024 | COT - CSOL - Electrical Progress Solar Project | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01422
Permit Description: relocation of existing solar canopy system 210.6 DC KW
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/03/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Approved (5) solar structure columns, okay for concrete placement | |
02/01/2024 | COT - CSOL - Electrical Underground Solar Project | Passed | Approved and complete underground from bore pits to panel/equipment, okay to for concrete placement | |
02/12/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
02/12/2024 | COT - CSOL - Electrical Final Solar Project | Passed | ||
02/12/2024 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
02/12/2024 | COT - LCBU - Building Final | Passed | ||
02/12/2024 | COT - LCEL - Electrical Final | Passed | ||
02/21/2024 | ENGR Engineering Final | Passed | ||
02/21/2024 | TRSP - ROW - Final/Close-Out | Passed |