Permit: TC-COM-0526-00755
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2730 E DREXEL RD BLDG 2 UNIT 2110
Address NEW:
2730 E DREXEL RD BLDG 2 UNIT 2110
Apply Date:
05/21/2026
Applicant:
Corene Strickland
Description:
Installation of pallet rack
Permit Reviews
Permit Number - TC-COM-0526-00755
Permit Status: Complete
Permit Description: Installation of pallet rack
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/05/2026 | RESTAMP - COMMERCIAL v.1 | 08/07/2026 | APPROVED |
| 09/24/2026 | SPECIAL INSPECTION REVIEW v.1 | 09/24/2026 | REQUIRES RESUBMIT |
| 10/01/2026 | SPECIAL INSPECTION REVIEW v.2 | 10/01/2026 | APPROVED |
| 05/26/2026 | COMMERCIAL REVIEW - FULL v.1 | 06/16/2026 | REQUIRES RESUBMIT |
| 08/11/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/13/2026 | APPROVED |
| 07/15/2026 | COMMERCIAL REVIEW - FULL v.2 | 08/05/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0526-00755
Permit Status: Complete
Permit Description: Installation of pallet rack
| Date | Description | Comments |
|---|---|---|
| 05/26/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/12/2026 | Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required. | |
| 05/26/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/03/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0526-00755
Permit Description: Installation of pallet rack
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | COT - FCON - Fire - Final | Passed | ||
| 08/31/2026 | COT - LCBU - Building Final | Passed | 8-31-26: racking system installed per plans. | |
| 09/15/2026 | ENGR Engineering Final | Passed | ||
| 09/15/2026 | COT - LCBU - Framing | Passed |