Permit: TC-COM-0526-00730
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2351 N ALVERNON WY BLDG 1
Address NEW:
2351 N ALVERNON WY BLDG 1
Apply Date:
05/19/2026
Applicant:
Jon Mitchell
Description:
We will be relocating an existing TEP transformer to a new location. This will involve trenching new conduit to tie in points and pulling new feeders to the two buildings.
Permit Reviews
Permit Number - TC-COM-0526-00730
Permit Status: Complete
Permit Description: We will be relocating an existing TEP transformer to a new location. This will involve trenching new conduit to tie in points and pulling new feeders to the two buildings.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 05/28/2026 | APPROVED |
| 06/01/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/04/2026 | APPROVED |
| 05/19/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 05/21/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0526-00730
Permit Status: Complete
Permit Description: We will be relocating an existing TEP transformer to a new location. This will involve trenching new conduit to tie in points and pulling new feeders to the two buildings.
| Date | Description | Comments |
|---|---|---|
| 05/19/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0526-00730
Permite Description: We will be relocating an existing TEP transformer to a new location. This will involve trenching new conduit to tie in points and pulling new feeders to the two buildings.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | COT - LCEL - Electrical Intermediate | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0526-00730
Permit Description: We will be relocating an existing TEP transformer to a new location. This will involve trenching new conduit to tie in points and pulling new feeders to the two buildings.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | BULD - Electrical Clearance | Passed | ||
| 06/01/2026 | COT - LCEL - Electrical Underground | Passed | ||
| 10/19/2026 | COT - LCEL - Electrical Final | Passed |