Description:
Location: Unit 98 This estimate was approved to repipe unit 98. - Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line. - Threaded in a new 3/4x3/4x1” tee. - Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe. - Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location. - Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof. - Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater. - Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace. - Installed a new gas valve along with a new supply line to the furnace. - Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe. - Once finished, went into the unit and cut a large section of drywall, exposing the inside wall. - Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing. - Tied the pipe into a 3/4 black iron pipe on the roof. - Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line. - Went to the meter and put the system on test. Once the test was complete and no leaks were found.
Permit Reviews
Permit Number - TC-COM-0525-01078
Permit Status: Inspections
Permit Description: Location: Unit 98
This estimate was approved to repipe unit 98.
- Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line.
- Threaded in a new 3/4x3/4x1” tee.
- Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe.
- Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location.
- Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof.
- Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater.
- Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace.
- Installed a new gas valve along with a new supply line to the furnace.
- Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe.
- Once finished, went into the unit and cut a large section of drywall, exposing the inside wall.
- Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing.
- Tied the pipe into a 3/4 black iron pipe on the roof.
- Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line.
- Went to the meter and put the system on test. Once the test was complete and no leaks were found.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/02/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 06/05/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0525-01078
Permit Status: Inspections
Permit Description: Location: Unit 98
This estimate was approved to repipe unit 98.
- Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line.
- Threaded in a new 3/4x3/4x1” tee.
- Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe.
- Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location.
- Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof.
- Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater.
- Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace.
- Installed a new gas valve along with a new supply line to the furnace.
- Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe.
- Once finished, went into the unit and cut a large section of drywall, exposing the inside wall.
- Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing.
- Tied the pipe into a 3/4 black iron pipe on the roof.
- Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line.
- Went to the meter and put the system on test. Once the test was complete and no leaks were found.
| Date | Description | Comments |
|---|---|---|
| 06/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-01078
Permit Description: Location: Unit 98
This estimate was approved to repipe unit 98.
- Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line.
- Threaded in a new 3/4x3/4x1” tee.
- Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe.
- Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location.
- Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof.
- Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater.
- Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace.
- Installed a new gas valve along with a new supply line to the furnace.
- Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe.
- Once finished, went into the unit and cut a large section of drywall, exposing the inside wall.
- Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing.
- Tied the pipe into a 3/4 black iron pipe on the roof.
- Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line.
- Went to the meter and put the system on test. Once the test was complete and no leaks were found.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | COT - BULD - SWG Clearance | Passed | Approved gas piping and pressure test - SWG Clearance is required for unit #98 reconnection | |
| 06/13/2025 | COT - LCPL - Gas Pressure Test | Passed | ||
| 06/13/2025 | COT - LCPL - Plumbing Final | Passed |