Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
05/30/2025
Applicant:
Dean Bagley
Description:
Location: Unit 98 This estimate was approved to repipe unit 98. - Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line. - Threaded in a new 3/4x3/4x1” tee. - Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe. - Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location. - Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof. - Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater. - Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace. - Installed a new gas valve along with a new supply line to the furnace. - Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe. - Once finished, went into the unit and cut a large section of drywall, exposing the inside wall. - Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing. - Tied the pipe into a 3/4 black iron pipe on the roof. - Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line. - Went to the meter and put the system on test. Once the test was complete and no leaks were found.

Permit Reviews

Permit Number - TC-COM-0525-01078
Permit Status: Inspections
Permit Description: Location: Unit 98 This estimate was approved to repipe unit 98. - Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line. - Threaded in a new 3/4x3/4x1” tee. - Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe. - Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location. - Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof. - Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater. - Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace. - Installed a new gas valve along with a new supply line to the furnace. - Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe. - Once finished, went into the unit and cut a large section of drywall, exposing the inside wall. - Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing. - Tied the pipe into a 3/4 black iron pipe on the roof. - Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line. - Went to the meter and put the system on test. Once the test was complete and no leaks were found.
Start Date Submittal Complete Date Status  
06/02/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 06/05/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0525-01078
Permit Status: Inspections
Permit Description: Location: Unit 98 This estimate was approved to repipe unit 98. - Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line. - Threaded in a new 3/4x3/4x1” tee. - Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe. - Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location. - Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof. - Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater. - Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace. - Installed a new gas valve along with a new supply line to the furnace. - Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe. - Once finished, went into the unit and cut a large section of drywall, exposing the inside wall. - Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing. - Tied the pipe into a 3/4 black iron pipe on the roof. - Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line. - Went to the meter and put the system on test. Once the test was complete and no leaks were found.
Date Description Comments
06/02/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0525-01078
Permit Description: Location: Unit 98 This estimate was approved to repipe unit 98. - Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line. - Threaded in a new 3/4x3/4x1” tee. - Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe. - Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location. - Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof. - Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater. - Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace. - Installed a new gas valve along with a new supply line to the furnace. - Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe. - Once finished, went into the unit and cut a large section of drywall, exposing the inside wall. - Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing. - Tied the pipe into a 3/4 black iron pipe on the roof. - Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line. - Went to the meter and put the system on test. Once the test was complete and no leaks were found.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/13/2025 COT - BULD - SWG Clearance Passed Approved gas piping and pressure test - SWG Clearance is required for unit #98 reconnection
06/13/2025 COT - LCPL - Gas Pressure Test Passed
06/13/2025 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
VERTICAL NORTH UNIT 98 GAS_V1.PDF DOCUMENTS VIEW