Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Activity Search: TC-COM-0525-01078
Activity
Parcel Attributes
| Parcel | 11301127A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3, O-3 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | Campus Farm |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 12/10/2025 11:48 p.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0525-01078 | Inspections | 05/30/2025 | 12/10/2025 | UNIT 98 | Commercial Building | Location: Unit 98 This estimate was approved to repipe unit 98. - Begin at the meter. Removed the existing 3/4 tee and cut out any old visible gas line. - Threaded in a new 3/4x3/4x1” tee. - Ran a section of 10ft 1” black iron pipe and run along the roof an approximate 75ft section of 1” pipe, ensuring proper support of the pipe. - Threaded in a new 1x3/4x3/4 tee and ran a 5ft section of pipe going to the water heater.- Went inside the unit and drained down water heater and moved the water heater from location. - Cut a large section of drywall, exposing the inside wall, and drilled a hole going up and out to the roof. - Ran a section of 10ft 3/4 black iron pipe along with flashing. Installed a new 3/4 gas valve along with a new 3/4 gas supply line to the water heater. - Continued from the tee, then threaded in another section of 5ft section of 3/4 black iron pipe, threading in a new 3/4 tee and a 5ft section of 3/4 pipe going to the furnace. - Installed a new gas valve along with a new supply line to the furnace. - Continued from the 3/4 tee, we will thread in a 5ft section of black iron pipe. - Once finished, went into the unit and cut a large section of drywall, exposing the inside wall. - Drillred up and out to the roof. Once finished, installed a 10ft section of 3/4 black iron pipe along with flashing. - Tied the pipe into a 3/4 black iron pipe on the roof. - Went to the stove location and installed a new 3/4 gas valve along with a new 3/4 supply line. - Went to the meter and put the system on test. Once the test was complete and no leaks were found. |