Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/06/2025
Applicant:
Jonathan Parvin
Description:
Post water mitigation build-back in the three units - SF and Valuation for all three 3900, 40000.00

Permit Reviews

Permit Number - TC-COM-0525-01022
Permit Status: Complete
Permit Description: Post water mitigation build-back in the three units - SF and Valuation for all three 3900, 40000.00
Start Date Submittal Complete Date Status  
05/12/2025 COMMERCIAL REVIEW - FULL v.1 05/20/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0525-01022
Permit Status: Complete
Permit Description: Post water mitigation build-back in the three units - SF and Valuation for all three 3900, 40000.00
Date Description Comments
05/20/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0525-01022
Permite Description: Post water mitigation build-back in the three units - SF and Valuation for all three 3900, 40000.00
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
06/02/2025 COT - BULD - SWG Clearance N/A Not Applicable
06/18/2025 COT - LCEL - Electrical Final N/A Partial Pass Rough in
06/18/2025 COT - LCBU - Building Final N/A Partial Pass Rough in
06/18/2025 COT - LCME - Mechanical Final N/A Partial Pass Rough in
06/18/2025 COT - LCPL - Plumbing Final N/A Partial Pass Rough in

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0525-01022
Permit Description: Post water mitigation build-back in the three units - SF and Valuation for all three 3900, 40000.00
Total Completed Inspections - 10
Date Description Inspector Results Comments
06/02/2025 BULD - Electrical Clearance Passed
06/02/2025 TRSP - ROW - Final/Close-Out Passed
06/02/2025 COT - LCBU - Framing Passed
06/18/2025 ENGR Engineering Final Passed
06/18/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
08/08/2025 COT - LCEL - Electrical Final Passed
08/08/2025 COT - FCON - Fire - Final Passed
08/08/2025 COT - LCBU - Building Final Passed
08/08/2025 COT - LCME - Mechanical Final Passed
08/08/2025 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW