Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2720 N SWAN RD UNIT 9
Apply Date:
05/14/2025
Applicant:
Dean Bagley
Description:
Unit 9 We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris.

Permit Reviews

Permit Number - TC-COM-0525-00997
Permit Status: Complete
Permit Description: Unit 9 We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris.
Start Date Submittal Complete Date Status  
05/14/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 05/19/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0525-00997
Permit Status: Complete
Permit Description: Unit 9 We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris.
Date Description Comments
05/14/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0525-00997
Permite Description: Unit 9 We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/28/2025 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0525-00997
Permit Description: Unit 9 We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris.
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/21/2025 COT - LCPL - Gas Pressure Test Passed Hi Mr. Conrad,
I just sent in a SWG clearance for two meters located at 2720 N Swan, Units 3A and 3D. I entered them both on the permit for 2720 N Swan, Unit 11. For unit 3A there are the following numbers on the meter: 534, 0115063167, 359421475, and 04475534.  For Unit 3D the following numbers were on the meter: 250, and 73sC004250.
Thanks,
Robert

left voicemail with SWG at 2:00.
05/21/2025 COT - LCPL - Plumbing Final Passed Hi Mr. Conrad,
I just sent in a SWG clearance for two meters located at 2720 N Swan, Units 3A and 3D. I entered them both on the permit for 2720 N Swan, Unit 11. For unit 3A there are the following numbers on the meter: 534, 0115063167, 359421475, and 04475534.  For Unit 3D the following numbers were on the meter: 73sC004250.
Thanks,
Robert

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CAMINO DE LA SIERRA GAS REPIPE UNIT 9_V1.PDF DOCUMENTS VIEW