Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 2720 N SWAN RD
Search
Parcel Attributes
| Parcel | 110113600 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street+culvert |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 2 |
| Tucson Registered Neighborhood | Glenn Heights |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2720 N SWAN RD
Date - 12/08/2025 4:08 a.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 2720 N SWAN RD
Date - 12/08/2025 4:08 a.m.
Total Number Of Special Development Permits - (3)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000010452 | CLOSED | 07/29/2019 | N/A | Historical Information | ||
| T09SA00141 | COMPLETE | 05/26/2009 | N/A | Zoning Adminstration Letter | VERIFY ZONING COMPLIANCE; ADJACENT PROPERTY DESGNATIONS AND USES; ANY VARIANCES, SPECIAL PERMITS OR CONDITIONS; APPROVED SITE PLANE AND/OR CONDITIONS OF APPROVAL. | |
| T20SA00175 | COMPLETE | 06/12/2020 | N/A | Zoning Adminstration Letter | Zoning Compliance Letter Apartments |
Permits
Address: 2720 N SWAN RD
Date - 12/08/2025 4:08 a.m.
Total Number Of Permits - (25)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T21CM08833 | Expired | 11/10/2021 | 05/14/2022 | Residential Building - One or Two Family | 2720 N. SWAN RD. #14E - GAS IS OFF - NEW GAS PIPING TO REPAIR LEAK AND RESTORE GAS SERVICES. CONTACT | |
| TC-COM-1024-01987 | Withdrawn | 10/16/2024 | 04/14/2025 | UNIT 14 | Commercial Building | Replace damaged meter, 6 pack |
| TC-COM-1024-01971 | Issued | 10/14/2024 | 04/28/2025 | Commercial Building | Replacement of electrical service entrance equipment. | |
| TC-COM-0525-00997 | Complete | 05/14/2025 | 11/17/2025 | UNIT 9 | Commercial Building | Unit 9 We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris. |
| TC-COM-0525-00998 | Inspections | 05/14/2025 | 11/17/2025 | UNIT 11 | Commercial Building | Unit 11 We will run a 20ft section of 1” pipe from the meter up to roof once on roof we will drill a hole through block wall run a 5ft section of 1” pipe to furnace once at furnace we will go into unit and cut a section of drywall drilling a hole up to roof. Once hole is made we will install a 1”x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and run a 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris. |
| TC-COM-0525-00977 | Expired | 05/13/2025 | N/A | UNIT 3 | Commercial Building | 3a We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris. 3d We will run a 20ft section of 1” pipe from the meter up to roof once on roof we will drill a hole through block wall run a 5ft section of 1” pipe to furnace once at furnace we will go into unit and cut a section of drywall drilling a hole up to roof. Once hole is made we will install a 1”x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and run a 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris. |
| T11OT00191 | FINAL | 01/28/2011 | 10/30/2011 | SIGN | BANNER 90 DAY, FROM 01/29/2011 - 04/29/2011 | |
| T11OT00844 | FINAL | 04/28/2011 | 01/31/2012 | SIGN | BANNER 90 DAY, FROM 04/30/2011 - 07-29-2011 | |
| T11OT01531 | EXPIRED | 08/04/2011 | 05/02/2012 | SIGN | BANNER: 90 DAYS 08-04 - 11-02-11 | |
| T11OT01532 | FINAL | 08/04/2011 | 04/09/2012 | SIGN | BANNER: 45 DAYS AUG 22 - OCT 6 | |
| T11OT02280 | FINAL | 12/13/2011 | 10/01/2012 | SIGN | BANNER:90 DAYS 12-19-2011 T0 03-16-2012 | |
| T12OT00429 | FINAL | 03/15/2012 | 12/12/2012 | SIGN | BANNER 3/15/2012 THRU 6/13/2012 | |
| T12OT00867 | CLOSED | 06/13/2012 | 11/27/2016 | SIGN | BANNER 6/13/2012 THRU 9/11/2012 | |
| T12OT01388 | CLOSED | 09/28/2012 | 11/27/2016 | SIGN | BANNER 09/28/2012 THRU 12/27/2012 | |
| T13CM05596 | FINAL | 09/11/2013 | 03/12/2014 | #26 | COMBO | REPLACE 100 AMP BREAKER |
| T14OT01097 | CLOSED | 08/26/2014 | 11/27/2016 | SIGN | 90 DAY BANNER 08/26-11/24/2014 | |
| T15CM07027 | EXPIRED | 10/09/2015 | 04/18/2016 | #44 | COMBO | REPLACING ELECTRIC BREAKER |
| T15CM07528 | FINAL | 10/29/2015 | 05/11/2016 | #41 | COMBO | REPL 6 METER PK LIKE FOR LIKE;APTS |
| T15OT01037 | CLOSED | 08/07/2015 | 11/27/2016 | SIGN | BANNER, 90DAY, 08/07/15-11/05/2015 | |
| T16OT00374 | CLOSED | 03/23/2016 | 11/27/2016 | SIGN | 90DAY BANNER 03/23/16 - 06/21/16 | |
| T19CM01148 | FINAL | 02/15/2019 | 08/18/2019 | #14 | COMBO | NEW GAS LINE |
| T20CM01013 | FINAL | 02/12/2020 | 08/16/2020 | #25 | COMBO | E - NEW PANEL UPGRADE 400AMP |
| T20RW02771 | FINAL | 05/14/2020 | 08/20/2020 | ROW | N.728691 JOB WILL REQUIRE ACCESS TO MH#18762 TO SPLICE FIBER | |
| T21CM08624 | FINAL | 11/02/2021 | 05/14/2022 | 14 | COMBO | 2720 N. SWAN RD UNIT 14F - GAS OFF. NEW GAS PIPING TO EXISTING APPLIANCES TO RESTORE GAS SERVICES. SITE CONTACT: DANIEL 5207304734 |
| T99PL02107 | FINAL | 09/30/1999 | 04/01/2000 | #04 | PLUMB | GAS LINE:REPLACEMENT |
Code Enforcement
Address: 2720 N SWAN RD
Date - 12/08/2025 4:08 a.m.
Total Number Of Code Cases - (4)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0823-05222 | Closed - Unfounded | 08/24/2023 | 11/30/2023 | RMIN / Unit 14-A / Roach and mice infestation | ||
| CE-VIO1025-04723 | Active | 10/27/2025 | UNIT 14 | RMIN / UNIT 14B : No A/C for 3 days | ||
| CE-VIO0925-03819 | Closed - Resolved | 09/05/2025 | 10/02/2025 | UNIT 14 | RMIN / garbage disposal not working properly, plumbing is being backed up. Roaches of all sizes. NOTE: address on gate is 2720 N SWAN RD Unit 14B | |
| CE-VIO0924-03886 | Closed - Resolved | 09/25/2024 | 11/26/2024 | Emergency / Referred from TFD / Unit 14-F / Sparks and smoke from Electric panel serving Building 14 |
Record Requests
Address: 2720 N SWAN RD
Date - 12/08/2025 4:08 a.m.
Total Number Of Requests - (1)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-1124-07444 | Complete | 11/01/2024 | 11/06/2024 | Requests | Replace damaged meter, 6 pack |