Permit Details

Status:
Expired
Type:
Commercial Building
Address NEW:
2720 N SWAN RD UNIT 3
Apply Date:
05/13/2025
Applicant:
Dean Bagley
Description:
3a We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris. 3d We will run a 20ft section of 1” pipe from the meter up to roof once on roof we will drill a hole through block wall run a 5ft section of 1” pipe to furnace once at furnace we will go into unit and cut a section of drywall drilling a hole up to roof. Once hole is made we will install a 1”x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and run a 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris.

Permit Reviews

Permit Number - TC-COM-0525-00977
Permit Status: Expired
Permit Description: 3a We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris. 3d We will run a 20ft section of 1” pipe from the meter up to roof once on roof we will drill a hole through block wall run a 5ft section of 1” pipe to furnace once at furnace we will go into unit and cut a section of drywall drilling a hole up to roof. Once hole is made we will install a 1”x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and run a 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris.
Start Date Submittal Complete Date Status  
05/14/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 05/14/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0525-00977
Permit Status: Expired
Permit Description: 3a We will have a 20 ft section of 1” pipe along the wall, then 10ft up to the roof, we will then drill a hole through the block wall running pipe along with 5ft toward the furnace. we will install a 1x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and drill a hole and run a new 10ft section of 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris. 3d We will run a 20ft section of 1” pipe from the meter up to roof once on roof we will drill a hole through block wall run a 5ft section of 1” pipe to furnace once at furnace we will go into unit and cut a section of drywall drilling a hole up to roof. Once hole is made we will install a 1”x3/4 tee on roof and run a 2ft section of 3/4 pipe to furnace installing a new gas shut off valve and supply line we will then go into unit cut drywall and run a 3/4 pipe down into unit to water heater installing a gas valve and supply line. Once the repair is complete, we will put the unit on test and check for leaks. Once no leaks are found, we will clean up all debris.
Total Outstanding Activity Conditions - 1
Date Name
05/14/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.