Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0525-00929
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
7000 S ALVERNON WY
Address NEW:
7000 S ALVERNON WY
Apply Date:
05/06/2025
Applicant:
Andrew Freeman
Description:
HVAC System upgrades
Permit Reviews
Permit Number - TC-COM-0525-00929
Permit Status: Inspections
Permit Description: HVAC System upgrades
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2025 | COMMERCIAL REVIEW - FULL v.2 | 10/14/2025 | APPROVED |
| 10/14/2025 | RESTAMP - COMMERCIAL v.1 | 10/17/2025 | APPROVED |
| 05/12/2025 | COMMERCIAL REVIEW - FULL v.1 | 06/04/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0525-00929
Permit Status: Inspections
Permit Description: HVAC System upgrades
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/03/2025 | AIR BALANCING REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0525-00929
Permit Status: Inspections
Permit Description: HVAC System upgrades
| Date | Description | Comments |
|---|---|---|
| 05/12/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-00929
Permite Description: HVAC System upgrades
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2026 | COT - LCPL - Plumbing Final | N/A | Not Ready | 1/5/26: air gap required at condensate discharge at floor drain, properly secure electrical low-voltage wiring at all Units, all Exterior receptacles shall be tested at Final and be WR, labels required on all (disconnect boxes, units, panels, new circuit breaker at MSB), open all junction boxes to verify bond/bushings at raceways, verify wire size at MSB for new circuit, verify all metallic boxes are grounded, verify framing around new openings, all supports must be attached head to cable at flexible duct, condensate drain insulation must be protected from UV EXPOSURE. WILL BE VERIFIED AT FINAL. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-00929
Permit Description: HVAC System upgrades
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2026 | COT - LCBU - Framing | Passed | ||
| 01/05/2026 | COT - LCME - Mechanical Intermediate | Passed | ||
| 01/05/2026 | COT - LCEL - Electrical Intermediate | Passed |