Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
812 E SPEEDWAY BL
Apply Date:
05/31/2024
Applicant:
Brad Bane
Description:
Foundation only for Capstone Apartments

Permit Reviews

Permit Number - TC-COM-0524-01058
Permit Status: Issued
Permit Description: Foundation only for Capstone Apartments
Start Date Submittal Complete Date Status  
05/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/13/2025 APPROVED Review Details
08/07/2024 COMMERCIAL REVIEW - FULL v.3 09/12/2024 REQUIRES RESUBMIT Review Details
11/25/2024 COMMERCIAL REVIEW - FULL v.4 12/03/2024 REQUIRES RESUBMIT Review Details
01/30/2025 RESTAMP - COMMERCIAL v.1 01/30/2025 APPROVED Review Details
01/27/2025 COMMERCIAL REVIEW - FULL v.6 01/30/2025 APPROVED Review Details
06/03/2024 COMMERCIAL REVIEW - FULL v.1 06/03/2024 REQUIRES RESUBMIT Review Details
06/06/2024 COMMERCIAL REVIEW - FULL v.2 07/12/2024 REQUIRES RESUBMIT Review Details
12/11/2024 COMMERCIAL REVIEW - FULL v.5 01/09/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0524-01058
Permit Status: Issued
Permit Description: Foundation only for Capstone Apartments
Total Outstanding Activity Conditions - 13
Date Name
01/29/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
01/29/2025 Masonry Inspection Report submittal review is required.
01/29/2025 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/29/2025 Post-Installed Anchor Inspection Report is required.
01/29/2025 Post-Tension Inspection Report is required.
01/29/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/29/2025 SPECIAL INSPECTION FOR Structural Steel IS REQUIRED
01/29/2025 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Conditions

Permit Number - TC-COM-0524-01058
Permit Status: Issued
Permit Description: Foundation only for Capstone Apartments
Date Description Comments
01/27/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/19/2025 Crane Designs must be submitted and approved prior to ...
01/27/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/11/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0524-01058
Permite Description: Foundation only for Capstone Apartments
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/22/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass Grade beam at GL;,7.3/E.5 - C.5. Interior wall at GL; 3.5 - 7.5/C.5 at 10’. Ok to set forms and place concrete.
08/13/2025 COT - HCEL - Electrical Underground N/A Partial Pass Conduit lines into elevator shaft to power sump pump.
08/14/2025 COT - HCBU - Stem Wall/Retaining Wall N/A Partial Pass Column piers at 9/E, 9/C; Column pilasters at Gl: 1/E.5, 1/B, 1/A. OK to place concrete in progress areas.
08/26/2025 COT - HCPL - Rough Soil N/A Partial Pass Waste lines at 4”; GL: A - E.5/7.5 - 11. OK to cover progress areas.