Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 11504505A


Addresses:

812 E SPEEDWAY BL


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Permit Number - TC-COM-0524-01058

Inspection Description - COT - HCBU - Excavation/Rebar/Zoning 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
04/04/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson cages (19) CC3, one crane caisson cage at 27’ x 5’. Ok to place concert in progress areas.
04/09/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson footings at GL: 8 - 9.5/F9.9-11.5; A/1.2. Ok to place concrete in progress areas.
04/10/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson footings with cages in place at GL: A/2, E/1, 10.9/A. Ok to place concrete in footings.
04/11/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson footings drilled and cages placed (9) at GL: A-A.1/12 - 1, A/1 - 13. Ok to place concrete in progress areas.
04/21/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Pier caps for caisson footings (47)
05/21/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Shot-Crete for retaining wall at GL: A/5.5 - 10
05/30/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Soil nails drilled and grouted at GL: D/4 - 12: # 177, 248, 176, 175, 174, 173, 172, 171, 170, 169, 168, 167, 166, 165, 164, 163, 162, 161, 160, 159, 158, 157, 157.
06/16/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Crane caisson footings and cages at 32’ (3 each). Ok to place concrete in progress areas.
06/17/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
06/18/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Over head crane pad at 20’ x 20’; rebar and bonding grip in place Ok to place concrete in progress areas. Two each caisson cages at 5’ x 37’6”. Ok to place cages in completed caissons.
06/20/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Drilled caisson footings at E3/3 - 9. Caisson cages at 8/D CF5, 7 - E/CF5, 8 - C/CF5, 7 - C/CF5, 3 - E/CF3a, CF2r. Ok to place completed cages in caisson footings.
06/23/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson cages at 4 - D, CF4; 6 - E, CF4; 6 - D, CF4; 5 - D; CF4; 7 - D;CF5; 8 - E; CF5, 8 - D; CF5; 4 - E; CF5, 5 - E; CF5; 8 - C; CF5; 7 - C; CF5
06/24/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson rebar cages at: 10 - C, CF5; 2 - E, CF4; 9 - B, CF4; 3 - D; CF4; T - CF1; U, CF1; K - CF1; R - CF2; M - CF2; M - CF1; V - CFI; P - CF2; D - CF3; C - CF2.
06/26/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson footings cages at: 5-B, CF5; 2-C,CF5; 8-D, CF5; 2-B, CF4; 5-C, CF5; 4-B, CF5; 8-E, CF5; 3-D, CF4; 7-E, CF5; 6-E, CF4.
06/30/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson footings cages at: 11-A, CF5; 4-B, CF5; 3-B, CF5; 3-D, CF4; 5-C,CF5; 2-B,CF4; 3-C, CF5; 2-C, CF5; 4-C, CF5; 6-E, CF4; 7-E, CF5. OK to place cages in designated areas.
07/01/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson footings cages at: 5-C, CF5; 11-E, CF5; 11-D, CF5; 4-C,CF5; 2-C, CF5; 3-D, CF4; 4-B, CF5; 9-E,CF5; 3-C, CF5, 3-B,CF5. OK to place cages in caisson footings.
07/02/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson rebar cages at: 7-B, CF5; 12-E, CF5, 8-C, CD5, 6-C, CF5; 6-C,CF5, 2-D, CF5; 9-B, CF4, 12-D, CF5; 5-B, CF5; 7-C, CF5; 8-B, CF5; 11, CF5. Ok to place cages in caisson footings and place concrete in progress areas.
07/03/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson footings rebar cages at: 5-C, CF5; 11-E, CF5, 11-D, CF5; 4-B, CF5; 3-C, CF5; 9-3, CF5; 7-B,CF5; 12-D, CF5; 4-C, CF5; 11-B, CF5;.
07/07/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Cap placement at 52” in caissons E/3-8 (6), Ok to place concrete in progress areas. Caissons footings to receive cages at 3-C, 4-B.
07/08/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Trench/rebar for structural support for West wall at GL: 4 - 9/G. Pier caps (6) at GL; 4-9/G. Ok to place concrete in progress areas..
07/09/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Pier cap footing at GL: E/5. Ok to place concrete in progress area.
07/10/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Pier caps at GL: F/4.9 - 7; G/R.9 - 7. OK to place concrete in progress areas.
07/11/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass aisson footings at 7/D, 6/D, 5/D, R/D, 8/C. Pier caps at E/4, E/3, E/2, E/1. OK to place concrete in progress areas.
07/14/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass West exterior wall rebar at 8’ - 10’, approximately 40’. Ok to place forms and place concrete in progress areas. Rebar footings and 4 each column pier caps at GL: E/1 - 4. Ok to -lace concrete in progress areas.
07/15/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass South stairwell footing at GL: C.75-D/1-2. Column pier caps at GL: A/2 - 4 (3 each). Ok to place concrete in progress areas.
07/16/2025 COT - HCBU - Excavation/Rebar/Zoning  Not Ready
07/17/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass West exterior wall at 10’ approximately 80 ‘. Rebar and forms are in place; Ok to place concrete in progress areas. Caisson footings with cages,at, CF2 C.5/4.5, E/4.5, 5/C.5. West exterior wall at 8’ - 10’ at 4 - 7.5/E-5; caisson footings with cages (CF-2)4/E.5, 4.5/C.5,5/C.5. OK to place concrete in progress areas.
07/18/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Grade beam at GL: C.5/3 - 7.1; 4 caisson footings with cages at GL: 11/D - E, 10.3/D - E. OK to place concrete in progress areas.
07/21/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Caisson footings pier caps at GL: D/7, D/6, D/5, D/4, B/4, B/T, E/11, E/10.3, D/11, D/10.3. OK to place concrete in progress areas.
07/22/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Grade beam at GL;,7.3/E.5 - C.5. Interior wall at GL; 3.5 - 7.5/C.5 at 10’. Ok to set forms and place concrete.