Permit: TC-COM-0524-01058
Permit Details
Apply Date:
05/31/2024
Applicant:
Brad Bane
Description:
Foundation only for Capstone Apartments
Permit Reviews
Permit Number - TC-COM-0524-01058
Permit Status: Issued
Permit Description: Foundation only for Capstone Apartments
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/13/2025 | APPROVED |
| 08/07/2024 | COMMERCIAL REVIEW - FULL v.3 | 09/12/2024 | REQUIRES RESUBMIT |
| 11/25/2024 | COMMERCIAL REVIEW - FULL v.4 | 12/03/2024 | REQUIRES RESUBMIT |
| 01/30/2025 | RESTAMP - COMMERCIAL v.1 | 01/30/2025 | APPROVED |
| 01/27/2025 | COMMERCIAL REVIEW - FULL v.6 | 01/30/2025 | APPROVED |
| 06/03/2024 | COMMERCIAL REVIEW - FULL v.1 | 06/03/2024 | REQUIRES RESUBMIT |
| 06/06/2024 | COMMERCIAL REVIEW - FULL v.2 | 07/12/2024 | REQUIRES RESUBMIT |
| 12/11/2024 | COMMERCIAL REVIEW - FULL v.5 | 01/09/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0524-01058
Permit Status: Issued
Permit Description: Foundation only for Capstone Apartments
Total Outstanding Activity Conditions - 13
| Date | Name |
|---|---|
| 01/29/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 01/29/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 01/29/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 01/29/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 01/29/2025 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 01/29/2025 | Masonry Inspection Report submittal review is required. |
| 01/29/2025 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. |
| 01/29/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 01/29/2025 | Post-Installed Anchor Inspection Report is required. |
| 01/29/2025 | Post-Tension Inspection Report is required. |
| 01/29/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 01/29/2025 | SPECIAL INSPECTION FOR Structural Steel IS REQUIRED |
| 01/29/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Conditions
Permit Number - TC-COM-0524-01058
Permit Status: Issued
Permit Description: Foundation only for Capstone Apartments
| Date | Description | Comments |
|---|---|---|
| 01/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/19/2025 | Crane Designs must be submitted and approved prior to ... | |
| 01/27/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/11/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0524-01058
Permite Description: Foundation only for Capstone Apartments
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Grade beam at GL;,7.3/E.5 - C.5. Interior wall at GL; 3.5 - 7.5/C.5 at 10’. Ok to set forms and place concrete. |
| 08/13/2025 | COT - HCEL - Electrical Underground | N/A | Partial Pass | Conduit lines into elevator shaft to power sump pump. |
| 08/14/2025 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Partial Pass | Column piers at 9/E, 9/C; Column pilasters at Gl: 1/E.5, 1/B, 1/A. OK to place concrete in progress areas. |
| 08/26/2025 | COT - HCPL - Rough Soil | N/A | Partial Pass | Waste lines at 4”; GL: A - E.5/7.5 - 11. OK to cover progress areas. |