Permit: TC-COM-0523-01249
Permit Details
Apply Date:
05/10/2023
Applicant:
Kevin Cameron
Description:
Tenant Improvement: Convert existing Bed Bath & Beyond space to a Sportsman's Warehouse. Includes sales floor, offices, toilet rooms, and storage. Mezzanine for Storage. Exterior improvements include site improvements and painting the building. New roof top units.
Permit Reviews
Permit Number - TC-COM-0523-01249
Permit Status: Complete
Permit Description: Tenant Improvement: Convert existing Bed Bath & Beyond space to a Sportsman's Warehouse. Includes sales floor, offices, toilet rooms, and storage. Mezzanine for Storage. Exterior improvements include site improvements and painting the building. New roof top units.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/22/2023 | APPROVED |
02/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | REQUIRES RESUBMIT |
06/24/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/29/2023 | APPROVED |
03/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/14/2024 | APPROVED |
12/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/23/2023 | APPROVED |
06/29/2023 | RESTAMP - COMMERCIAL v.1 | 07/03/2023 | APPROVED |
05/12/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/15/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0523-01249
Permit Status: Complete
Permit Description: Tenant Improvement: Convert existing Bed Bath & Beyond space to a Sportsman's Warehouse. Includes sales floor, offices, toilet rooms, and storage. Mezzanine for Storage. Exterior improvements include site improvements and painting the building. New roof top units.
Date | Description | Comments |
---|---|---|
06/27/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
05/12/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
06/27/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/27/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
06/27/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
02/23/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
02/23/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
06/27/2023 | Masonry Inspection Report submittal review is required. | |
06/27/2023 | Post-Installed Anchor Inspection Report is required. | |
06/27/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01249
Permite Description: Tenant Improvement: Convert existing Bed Bath & Beyond space to a Sportsman's Warehouse. Includes sales floor, offices, toilet rooms, and storage. Mezzanine for Storage. Exterior improvements include site improvements and painting the building. New roof top units.
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/14/2023 | COT - HCBU - Framing | N/A | Partial Pass | Partial approval for north and south demising walls fur outs, OK to proceed includes fur outs and electrical intermediate on those walls Partial approval for north east corner of for walls located drywall 9/14/23: North East interior framing per plan ok to insulate, exterior wall of will-call area ok to one side, framing at sales floor at mezzanine ok to cover and insulate (14’ OSB from top coming down),south end demising wall ok to cover, two offices and break room under mezzanine ok to insulate and cover, conveyer wall ok to insulate and cover. Mezzanine ok to insulate and cover |
10/12/2023 | COT - HCBU - Building Above Ceiling | N/A | Not Ready | |
10/12/2023 | COT - HCEL - Electrical Above Ceiling | N/A | Not Ready | |
10/27/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
10/27/2023 | BULD - Electrical Clearance | N/A | Not Applicable | |
COT - FCON - Alarm - Final | N/A | Not Ready | ||
10/30/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Ok for TCO for shelving and merchandise. |
11/07/2023 | COT - HCBU - Building Final | N/A | Partial Pass | 10/30/23: level 1 TCO- furniture and stocking/ no public. Bathrooms missing partition walls and mirrors. 11/7/23: level 4TCO, pending fire. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01249
Permit Description: Tenant Improvement: Convert existing Bed Bath & Beyond space to a Sportsman's Warehouse. Includes sales floor, offices, toilet rooms, and storage. Mezzanine for Storage. Exterior improvements include site improvements and painting the building. New roof top units.
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/14/2023 | COT - HCBU - Building Progress | Passed | ||
09/12/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
09/12/2023 | COT - HCPL - Plumbing Intermediate | Passed | ||
09/18/2023 | COT - HCBU - Masonry Pregrout | Passed | 9/18/23: store front existing door and frame removed and covered. Passed | |
09/22/2023 | COT - HCBU - Framing | Passed | 9/22/23: Framing is complete throughout store. Okay to proceed with installing insulation and drywall. | |
09/22/2023 | COT - HCEL - Electrical Progress | Passed | 9/22/23: Electrical rough-in throughout store is complete. Okay to proceed with installing insulation and drywall. | |
09/28/2023 | COT - HCPL - Plumbing Progress | Passed | ||
10/03/2023 | COT - HCME - Mechanical Intermediate | Passed | ||
10/03/2023 | COT - HCME - Mechanical Progress | Passed | ||
10/12/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
10/20/2023 | COT - HCBU - Building Above Ceiling | Passed | ||
10/20/2023 | COT - HCEL - Electrical Above Ceiling | Passed | ||
10/20/2023 | COT - HCME - Mechanical Above Ceiling | Passed | 10/20/23: mechanical per plan ok to proceed | |
10/27/2023 | COT - HCEL - Outdoor Lighting | Passed | ||
10/30/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
10/30/2023 | COT - HCME - Mechanical Final | Passed | 10/26/23 please support, gas, piping and condensate lines on roof to RTU and sunshield wires to fans on units 10/30/23: corrections made |
|
10/30/2023 | COT - HCEL - Electrical Final | Passed | ||
10/30/2023 | COT - FCON - Sprinkler - Final | Passed | ||
11/02/2023 | COT - FCON - Alarm - Final | Passed | ||
11/02/2023 | COT - HCPL - Plumbing Final | Passed | ||
11/03/2023 | ENGR Engineering Final | Passed | ||
11/08/2023 | COT - FCON - Fire - Final | Passed | ||
11/13/2023 | COT - HCBU - Building Final | Passed | level 4 |