Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Framing
Permit Number - TC-COM-0523-01249
Inspection Description - COT - HCBU - Framing
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/16/2023 | COT - HCBU - Framing | Partial Pass | Partial approval for north and south demising walls fur outs, OK to proceed includes fur outs and electrical intermediate on those walls | |
08/28/2023 | COT - HCBU - Framing | Partial Pass | Partial approval for north east corner of for walls located drywall | |
COT - HCBU - Framing | Partial Pass | Partial approval for north and south demising walls fur outs, OK to proceed includes fur outs and electrical intermediate on those walls Partial approval for north east corner of for walls located drywall 9/14/23: North East interior framing per plan ok to insulate, exterior wall of will-call area ok to one side, framing at sales floor at mezzanine ok to cover and insulate (14’ OSB from top coming down),south end demising wall ok to cover, two offices and break room under mezzanine ok to insulate and cover, conveyer wall ok to insulate and cover. Mezzanine ok to insulate and cover |
||
09/18/2023 | COT - HCBU - Framing | Partial Pass | Partial approval for north and south demising walls fur outs, OK to proceed includes fur outs and electrical intermediate on those walls Partial approval for north east corner of for walls located drywall 9/14/23: North East interior framing per plan ok to insulate, exterior wall of will-call area ok to one side, framing at sales floor at mezzanine ok to cover and insulate (14’ OSB from top coming down),south end demising wall ok to cover, two offices and break room under mezzanine ok to insulate and cover, conveyer wall ok to insulate and cover. Mezzanine ok to insulate and cover 9/18/23: Framing through store front south east and south west ok to insulate, Stair way hall way walls framed per plan, Shop and archery lane ok to insulate and proceed, janitors closet ok to proceed, bathroom framing in walls ok to proceed, partial on bathroom ceilings. |
|
09/22/2023 | COT - HCBU - Framing | Passed | 9/22/23: Framing is complete throughout store. Okay to proceed with installing insulation and drywall. |