Permit: TC-COM-0523-01171
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6601 E GRANT RD UNIT 161
Address NEW:
6601 E GRANT RD UNIT 161
Apply Date:
05/01/2023
Applicant:
David Caburnay
Description:
Interior tenant improvement of a new Jamba Juice selling beverages and snack goods; as per plans
Permit Reviews
Permit Number - TC-COM-0523-01171
Permit Status: Complete
Permit Description: Interior tenant improvement of a new Jamba Juice selling beverages and snack goods; as per plans
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2024 | RESTAMP - COMMERCIAL v.1 | 02/06/2024 | APPROVED |
| 10/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/08/2024 | APPROVED |
| 10/04/2023 | RESTAMP - COMMERCIAL v.1 | 10/12/2023 | APPROVED |
| 05/08/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/14/2023 | REQUIRES RESUBMIT |
| 11/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
| 09/25/2023 | COMMERCIAL REVIEW - FULL v.3 | 10/04/2023 | APPROVED |
| 07/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/12/2024 | APPROVED |
| 09/07/2023 | COMMERCIAL REVIEW - FULL v.2 | 09/18/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0523-01171
Permit Status: Complete
Permit Description: Interior tenant improvement of a new Jamba Juice selling beverages and snack goods; as per plans
| Date | Description | Comments |
|---|---|---|
| 06/30/2023 | Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512 | |
| 07/10/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 06/30/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 07/10/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 09/26/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. | |
| 07/10/2024 | Please submit a separate sign permit for an signs associated with this projet. | |
| 09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01171
Permite Description: Interior tenant improvement of a new Jamba Juice selling beverages and snack goods; as per plans
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2024 | COT - HCPL - Gas Final | N/A | Not Applicable | |
| 03/11/2024 | COT - HCPL - Gas Pressure Test | N/A | Not Applicable | |
| 02/06/2024 | COT - HCBU - Preslab | N/A | Not Ready | Added Underground plumbing that was missing. |
| 03/11/2024 | COT - HCME - Mechanical Intermediate | N/A | Not Ready | |
| 03/11/2024 | COT - HCPL - Plumbing Above Ceiling | N/A | Not Ready | |
| 07/10/2024 | ENGR Engineering Final | N/A | Partial Pass | i’m giving the contractor TCO4. Contractor still needs to address the roof drain system so the water doesn’t come onto the sidewalk on the west side and one on the north side also has to address the slope from the sidewalk to the trash enclosure cause that exceeds the 5% running slope. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01171
Permit Description: Interior tenant improvement of a new Jamba Juice selling beverages and snack goods; as per plans
Total Completed Inspections - 24
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2024 | COT - HCPL - Rough Soil | Passed | ||
| 03/11/2024 | COT - HCBU - Framing | Passed | ||
| 03/11/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 03/11/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
| 03/11/2024 | COT - HCEL - Electrical Underground | Passed | ||
| 03/11/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 05/29/2024 | COT - HCBU - Building Above Ceiling | Passed | Mechanical, electrical, and plumbing rough in above ceiling is complete. Okay to proceed with ceiling tile installation. | |
| 05/29/2024 | COT - HCBU - Preslab | Passed | Concrete pour back is complete where new underground plumbing pipes were installed. | |
| 05/29/2024 | COT - HCEL - Electrical Above Ceiling | Passed | Mechanical, electrical, and plumbing rough in above ceiling is complete. Okay to proceed with ceiling tile installation. | |
| 05/29/2024 | COT - HCME - Mechanical Above Ceiling | Passed | Mechanical, electrical, and plumbing rough in above ceiling is complete. Okay to proceed with ceiling tile installation. | |
| 05/29/2024 | COT - HCME - Mechanical Intermediate | Passed | Mechanical, electrical, and plumbing rough in above ceiling is complete. Okay to proceed with ceiling tile installation. | |
| 05/29/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | Mechanical, electrical, and plumbing rough in above ceiling is complete. Okay to proceed with ceiling tile installation. | |
| 07/03/2024 | COT - HCBU - Building Final | Passed | ||
| 07/03/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 07/03/2024 | COT - HCEL - Electrical Final | Passed | ||
| 07/03/2024 | COT - HCME - Mechanical Final | Passed | ||
| 07/03/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 07/03/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/09/2024 | COT - FCON - Alarm - Final | Passed | ||
| 07/09/2024 | COT - FCON - Fire - Final | Passed | ||
| 07/09/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 09/25/2024 | BULD - Electrical Clearance | Passed | Meter is already installed and business is open and operational. | |
| 09/25/2024 | COT - BULD - SWG Clearance | Passed | Business doesn't use natural gas. Okay to issue Certificate of Completion or Occupancy. | |
| 09/26/2024 | ENGR Engineering Final | Passed |