Permit Details
Status:
In Review
Type:
Commercial Building
Address:
2455 N FAIRVIEW AV
Address NEW:
2455 N FAIRVIEW AV
Apply Date:
04/28/2026
Applicant:
Ian Geitner
Description:
THE PROJECT IS A NEW 3,600 SF BUILD FOR A TRAINING FACILITY FOR THE PASCUA YAQUI DEVELOPMENT CORPORATION (PYDC). THE BUILDING INCLUDES OFFICES, RECEPTION, CLASSROOMS, TOOL STORAGE, AND SUPPORT SPACES.
Permit Reviews
Permit Number - TC-COM-0426-00621
Permit Status: In review
Permit Description: THE PROJECT IS A NEW 3,600 SF BUILD FOR A TRAINING FACILITY FOR
THE PASCUA YAQUI DEVELOPMENT CORPORATION (PYDC). THE BUILDING INCLUDES OFFICES, RECEPTION,
CLASSROOMS, TOOL STORAGE, AND SUPPORT SPACES.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/05/2026 | COMMERCIAL REVIEW - FULL v.1 | 05/28/2026 | REQUIRES RESUBMIT |
| 08/05/2026 | COMMERCIAL REVIEW - FULL v.3 | N/A | IN REVIEW |
| 07/29/2026 | COMMERCIAL REVIEW - FULL v.2 | 07/29/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0426-00621
Permit Status: In review
Permit Description: THE PROJECT IS A NEW 3,600 SF BUILD FOR A TRAINING FACILITY FOR
THE PASCUA YAQUI DEVELOPMENT CORPORATION (PYDC). THE BUILDING INCLUDES OFFICES, RECEPTION,
CLASSROOMS, TOOL STORAGE, AND SUPPORT SPACES.
Total Outstanding Activity Conditions - 16
| Date | Name |
|---|---|
| 05/05/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 05/05/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 05/20/2026 | SPECIAL INSPECTION OF BOLTS INSTALLED IN CONCRETE. IS REQUIRED. |
| 05/20/2026 | SPECIAL INSPECTION OF STRUCTURAL CONCRETE WORK. IS REQUIRED. |
| 05/20/2026 | SPECIAL INSPECTION OF REINFORCING SECURED WITH EPOXY. |
| 05/20/2026 | SPECIAL INSPECTION OF HIGH STRENGTH BOLTING (SNUG TIGHT) IS REQUIRED. |
| 05/20/2026 | SPECIAL INSPECTION OF ALL MASONRY WORK IS REQUIRED. |
| 05/20/2026 | SPECIAL INSPECTION OF POST INSTALLED BOLTS (EXPANSION OR EPOXY TYPE) IS REQUIRED. |
| 05/20/2026 | SPECIAL INSPECTION OF REINFORCING STEEL (INCLUDING FLOOR TOPPING REINFORCING)FOR FIELD WELDING IS REQUIRED. |
| 05/20/2026 | SPECIAL INSPECTION OF ENGINEERED FILL PLACEMENTE IS REQUIRED. |
| 05/20/2026 | SPECIAL INSPECTION OF FOUNDATION EXCAVATIONS PRIOR TO CONCRETE PLACEMENT IS REQUIRED. |
| 05/20/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
| 05/20/2026 | PREFABRICATED WOOD TRUSSES AND CALCULATIONS must be submitted and approved prior to finaling the permit if commercial building. |
| 05/20/2026 | SPECIAL INSPECTION OF STRUCTURAL WELDING (FIELD & SHOP). IS REQUIRED. |
| 05/21/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 05/21/2026 | WATER STERILIZATION REPORT IS REQUIRED. |