Permit: TC-COM-0426-00572
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3025 E SPEEDWAY BL
Address NEW:
3025 E SPEEDWAY BL
Apply Date:
04/19/2026
Applicant:
Carlos Gil
Description:
Remodel of existing Starbucks Coffee Shop to achieve CofO for new tenant. (REV #1: RELOCATED DUMP SINK, NEW WALK-IN COOLER, NEW ELEC RECEPTACLES) scope: replacing casework, replacing furniture, minor equipment changes, new interior partition walls, revised electrical panel schedule to match revised equipment. there are no changes to s.f., use, or occupancy
Permit Reviews
Permit Number - TC-COM-0426-00572
Permit Status: Complete
Permit Description: Remodel of existing Starbucks Coffee Shop to achieve CofO for new tenant. (REV #1: RELOCATED DUMP SINK, NEW WALK-IN COOLER, NEW ELEC RECEPTACLES)
scope: replacing casework, replacing furniture, minor equipment changes, new interior partition walls, revised electrical panel schedule to match revised equipment.
there are no changes to s.f., use, or occupancy
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/04/2026 | RESTAMP - COMMERCIAL v.1 | 08/06/2026 | APPROVED |
| 08/06/2026 | RESTAMP - COMMERCIAL v.1 | 08/07/2026 | APPROVED |
| 04/22/2026 | COMMERCIAL REVIEW - FULL v.1 | 05/13/2026 | APPROVED |
| 10/08/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/12/2026 | APPROVED |
| 07/15/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 08/04/2026 | APPROVED |
| 06/16/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 07/08/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0426-00572
Permit Status: Complete
Permit Description: Remodel of existing Starbucks Coffee Shop to achieve CofO for new tenant. (REV #1: RELOCATED DUMP SINK, NEW WALK-IN COOLER, NEW ELEC RECEPTACLES)
scope: replacing casework, replacing furniture, minor equipment changes, new interior partition walls, revised electrical panel schedule to match revised equipment.
there are no changes to s.f., use, or occupancy
| Date | Description | Comments |
|---|---|---|
| 04/22/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/01/2026 | Prior to Final - Required Documents - COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 04/22/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/01/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0426-00572
Permite Description: Remodel of existing Starbucks Coffee Shop to achieve CofO for new tenant. (REV #1: RELOCATED DUMP SINK, NEW WALK-IN COOLER, NEW ELEC RECEPTACLES)
scope: replacing casework, replacing furniture, minor equipment changes, new interior partition walls, revised electrical panel schedule to match revised equipment.
there are no changes to s.f., use, or occupancy
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2026 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | New branch circuits along with plumbing not included in approved set of plans. Framing not per plan. 6/9/2026 |
| 09/01/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/09/2026 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | New branch circuits along with plumbing not included in approved set of plans. Framing not per plan. 6/9/2026 |
| 09/28/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Addressing, occupancy load sign, places of assmebly permit, EM lights shall be repaired, Sprinkler trim shall be installed and ceiling tiles shall be in place. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0426-00572
Permit Description: Remodel of existing Starbucks Coffee Shop to achieve CofO for new tenant. (REV #1: RELOCATED DUMP SINK, NEW WALK-IN COOLER, NEW ELEC RECEPTACLES)
scope: replacing casework, replacing furniture, minor equipment changes, new interior partition walls, revised electrical panel schedule to match revised equipment.
there are no changes to s.f., use, or occupancy
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 08/25/2026 | PDSD Building Division Pre-Construction Meeting | Passed | ||
| 09/01/2026 | PDSD Building Division SIte Consultation | Passed | ||
| 09/01/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 09/01/2026 | COT - LCBU - Framing | Passed | ||
| 09/29/2026 | COT - LCME - Mechanical Final | Passed | ||
| 09/29/2026 | COT - LCEL - Electrical Final | Passed | ||
| 09/29/2026 | COT - LCPL - Plumbing Final | Passed | ||
| 09/28/2026 | TRSP - ROW - Notice of Completion | Passed | All work completed in the building no work in right of way | |
| 09/29/2026 | ENGR Engineering Final | Passed | ||
| 10/05/2026 | COT - LCBU - Building Final | Passed | ||
| 10/05/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 10/05/2026 | COT - FCON - Fire - Final | Passed |