Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
17 W CONGRESS ST
Address NEW:
17 W CONGRESS ST
Apply Date:
04/24/2025
Applicant:
Bonnie Schock
Description:
Exterior paint to match existing. /This project includes maintenance painting of the Fox Tucson Theatre and Arizona Daily Star Buildings. The stagehouse of the historic Fox Theatre was severely tagged in multiple locations in February of 2025. Additionally, both the historic Fox Theatre and the Arizona Daily Star Building, which serves as the Theatre’s administrative offices, are in need of repainting due to weathering, fading, and areas of cracking, chipping, and peeling. The buildings were last painted twenty years ago when they were renovated in 2005. The Fox has retained the same paint contractor who painted the buildings in 2005. Colors are being matched to existing on all surfaces. Existing colors were approved when the renovation took place in 2005. The full buildings will be repainted, including facades and up the full height of the stagehouse. In addition to repainting, the project will also replace the fabric awning that hangs on the front of the Fox Theatre, over the box office on the left side of the Congress façade. This fabric is significantly sun-faded and frayed and torn in many places, requiring replacement. While an exact fabric match is not possible, we have selected similar color and striped pattern to match as closely as possible to the existing fabric. This work does not constitute an alteration of any kind, but is necessary as a matter of basic maintenance and stewardship of our historic buildings.

Permit Reviews

Permit Number - TC-COM-0425-00829
Permit Status: Complete
Permit Description: Exterior paint to match existing. /This project includes maintenance painting of the Fox Tucson Theatre and Arizona Daily Star Buildings. The stagehouse of the historic Fox Theatre was severely tagged in multiple locations in February of 2025. Additionally, both the historic Fox Theatre and the Arizona Daily Star Building, which serves as the Theatre’s administrative offices, are in need of repainting due to weathering, fading, and areas of cracking, chipping, and peeling. The buildings were last painted twenty years ago when they were renovated in 2005. The Fox has retained the same paint contractor who painted the buildings in 2005. Colors are being matched to existing on all surfaces. Existing colors were approved when the renovation took place in 2005. The full buildings will be repainted, including facades and up the full height of the stagehouse. In addition to repainting, the project will also replace the fabric awning that hangs on the front of the Fox Theatre, over the box office on the left side of the Congress façade. This fabric is significantly sun-faded and frayed and torn in many places, requiring replacement. While an exact fabric match is not possible, we have selected similar color and striped pattern to match as closely as possible to the existing fabric. This work does not constitute an alteration of any kind, but is necessary as a matter of basic maintenance and stewardship of our historic buildings.
Start Date Submittal Complete Date Status  
04/25/2025 COMMERCIAL REVIEW - FULL v.1 04/25/2025 REQUIRES RESUBMIT Review Details
04/25/2025 COMMERCIAL REVIEW - FULL v.2 05/20/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00829
Permite Description: Exterior paint to match existing. /This project includes maintenance painting of the Fox Tucson Theatre and Arizona Daily Star Buildings. The stagehouse of the historic Fox Theatre was severely tagged in multiple locations in February of 2025. Additionally, both the historic Fox Theatre and the Arizona Daily Star Building, which serves as the Theatre’s administrative offices, are in need of repainting due to weathering, fading, and areas of cracking, chipping, and peeling. The buildings were last painted twenty years ago when they were renovated in 2005. The Fox has retained the same paint contractor who painted the buildings in 2005. Colors are being matched to existing on all surfaces. Existing colors were approved when the renovation took place in 2005. The full buildings will be repainted, including facades and up the full height of the stagehouse. In addition to repainting, the project will also replace the fabric awning that hangs on the front of the Fox Theatre, over the box office on the left side of the Congress façade. This fabric is significantly sun-faded and frayed and torn in many places, requiring replacement. While an exact fabric match is not possible, we have selected similar color and striped pattern to match as closely as possible to the existing fabric. This work does not constitute an alteration of any kind, but is necessary as a matter of basic maintenance and stewardship of our historic buildings.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/15/2025 BULD - Electrical Clearance N/A Not Applicable
09/15/2025 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00829
Permit Description: Exterior paint to match existing. /This project includes maintenance painting of the Fox Tucson Theatre and Arizona Daily Star Buildings. The stagehouse of the historic Fox Theatre was severely tagged in multiple locations in February of 2025. Additionally, both the historic Fox Theatre and the Arizona Daily Star Building, which serves as the Theatre’s administrative offices, are in need of repainting due to weathering, fading, and areas of cracking, chipping, and peeling. The buildings were last painted twenty years ago when they were renovated in 2005. The Fox has retained the same paint contractor who painted the buildings in 2005. Colors are being matched to existing on all surfaces. Existing colors were approved when the renovation took place in 2005. The full buildings will be repainted, including facades and up the full height of the stagehouse. In addition to repainting, the project will also replace the fabric awning that hangs on the front of the Fox Theatre, over the box office on the left side of the Congress façade. This fabric is significantly sun-faded and frayed and torn in many places, requiring replacement. While an exact fabric match is not possible, we have selected similar color and striped pattern to match as closely as possible to the existing fabric. This work does not constitute an alteration of any kind, but is necessary as a matter of basic maintenance and stewardship of our historic buildings.
Total Completed Inspections - 7
Date Description Inspector Results Comments
09/15/2025 TRSP - ROW - Final/Close-Out Passed
09/15/2025 COT - FCON - Fire - Final Passed Only thing done was painting.
09/15/2025 COT - LCBU - Building Final Passed
09/15/2025 COT - LCEL - Electrical Final Passed
09/15/2025 COT - LCME - Mechanical Final Passed
09/15/2025 COT - LCPL - Plumbing Final Passed
09/15/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-FOX TUCSON THEATRE PAINT AND AWNING PROJECT DESCRIPTION_V1.PDF DOCUMENTS VIEW
EXISTING CONDITION PHOTOS_V1.PDF DOCUMENTS VIEW
SD-0425-00044 DECISION NOTICE SIGNED UNPROTECTED DOCUMENT_V1.PDF DOCUMENTS VIEW