Permit: TC-COM-0425-00752
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1060 S HARRISON RD UNIT 120
Address NEW:
1060 S HARRISON RD UNIT 120
Apply Date:
04/15/2025
Applicant:
DONALD WEBB
Description:
DENTAL OFFICE EXPANSION, NON STRUCTURAL PARTITIONS, MECHANICAL DISTRIBUTION SUPPLY/RETURNS, PLUMBING, T-BAR CEILING, LIGHTS, OUTLETS, SWITCHES EXPAND THE EXISTING DENTAL OFFICE IN SUITE 110 INTO SUITE 120
Permit Reviews
Permit Number - TC-COM-0425-00752
Permit Status: Complete
Permit Description: DENTAL OFFICE EXPANSION, NON STRUCTURAL PARTITIONS, MECHANICAL
DISTRIBUTION SUPPLY/RETURNS, PLUMBING, T-BAR CEILING, LIGHTS, OUTLETS,
SWITCHES
EXPAND THE EXISTING DENTAL OFFICE IN SUITE 110 INTO SUITE 120
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/03/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 06/03/2025 | REQUIRES RESUBMIT |
| 06/06/2025 | COMMERCIAL REVIEW - LIMITED v.4 | 06/11/2025 | APPROVED |
| 06/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/26/2025 | APPROVED |
| 05/14/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 05/28/2025 | REQUIRES RESUBMIT |
| 10/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/14/2025 | APPROVED |
| 06/11/2025 | RESTAMP - COMMERCIAL v.1 | 06/16/2025 | APPROVED |
| 10/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/04/2025 | APPROVED |
| 07/08/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 07/28/2025 | APPROVED |
| 04/22/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 05/06/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0425-00752
Permit Status: Complete
Permit Description: DENTAL OFFICE EXPANSION, NON STRUCTURAL PARTITIONS, MECHANICAL
DISTRIBUTION SUPPLY/RETURNS, PLUMBING, T-BAR CEILING, LIGHTS, OUTLETS,
SWITCHES
EXPAND THE EXISTING DENTAL OFFICE IN SUITE 110 INTO SUITE 120
| Date | Description | Comments |
|---|---|---|
| 04/22/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 05/05/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 04/22/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/05/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 05/05/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00752
Permite Description: DENTAL OFFICE EXPANSION, NON STRUCTURAL PARTITIONS, MECHANICAL
DISTRIBUTION SUPPLY/RETURNS, PLUMBING, T-BAR CEILING, LIGHTS, OUTLETS,
SWITCHES
EXPAND THE EXISTING DENTAL OFFICE IN SUITE 110 INTO SUITE 120
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2025 | COT - LCPL - Rough Soil | N/A | Re-inspection required | 8-11-25: underground plumbing not per plans. Approved plumbing plans dated 6/2025 show 2 water closets, however, approved Architectural plans dated 7/2025 show 1 water closet on the floor plan. Contractor will look for more current plumbing plans at his office and reschedule inspection. In the event that he doesn't locate the most current set of plumbing plans, a letter from their architect or RFI will be required for review and approval by the city. |
| 10/28/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/30/2025 | COT - FCON - Sprinkler - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00752
Permit Description: DENTAL OFFICE EXPANSION, NON STRUCTURAL PARTITIONS, MECHANICAL
DISTRIBUTION SUPPLY/RETURNS, PLUMBING, T-BAR CEILING, LIGHTS, OUTLETS,
SWITCHES
EXPAND THE EXISTING DENTAL OFFICE IN SUITE 110 INTO SUITE 120
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2025 | COT - LCPL - Rough Soil | Passed | 8/12/25 corrections plans on site, ok to proceed | |
| 09/02/2025 | COT - LCBU - Framing | Passed | ||
| 09/02/2025 | COT - LCBU - Preslab | Passed | ||
| 09/04/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 09/05/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 09/05/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 10/22/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 10/28/2025 | COT - LCPL - Plumbing Final | Passed | Passed 10/28/25 | |
| 10/28/2025 | COT - LCEL - Electrical Final | Passed | Passed 10/28/25 | |
| 10/28/2025 | COT - LCME - Mechanical Final | Passed | Passed 10/28/25 | |
| 10/30/2025 | COT - FCON - Fire - Final | Passed | ||
| 10/30/2025 | COT - LCBU - Building Final | Passed | ||
| 10/30/2025 | ENGR Engineering Final | Passed | ||
| 10/30/2025 | TRSP - ROW - Final/Close-Out | Passed |