Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/14/2025
Applicant:
Amy Cotner
Description:
Speculative TI buildout in unoccupied Shell under separate permit.

Permit Reviews

Permit Number - TC-COM-0425-00740
Permit Status: Complete
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Start Date Submittal Complete Date Status  
06/10/2025 RESTAMP - COMMERCIAL v.1 06/23/2025 APPROVED Review Details
05/20/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/21/2026 APPROVED Review Details
06/06/2025 COMMERCIAL REVIEW - FULL v.2 06/10/2025 APPROVED Review Details
04/16/2025 COMMERCIAL REVIEW - FULL v.1 05/08/2025 REQUIRES RESUBMIT Review Details
03/25/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/06/2026 APPROVED Review Details
05/15/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/19/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0425-00740
Permit Status: Complete
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Date Description Comments
04/16/2025 BLDG 1 UNIT 1190 Needs to be added to cover sheet as part of the address to reflect this permit application.
04/16/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00740
Permite Description: Speculative TI buildout in unoccupied Shell under separate permit.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
12/29/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass 12-29-25: in wall domestic & DWV verified under test and per plans. Okay to continue with project at progress areas.
01/28/2026 COT - HCEL - Electrical Intermediate N/A Partial Pass 1/27/2026 in wall electrical at office areas approved. Okay to proceed with progress areas.
04/09/2026 COT - BULD - SWG Clearance N/A Not Applicable 4-9-26: not applicable.
12/18/2025 COT - HCBU - Framing N/A Partial Pass 12-18-25: framing for office demising wall approved. Okay to continue with construction at progress areas.
12/23/2025 COT - HCPL - Plumbing Progress N/A Partial Pass 12-23-25: in wall domestic needs to be under test. Okay to drywall warehouse side but reschedule domestic test prior to covering other side.
12/23/2025 COT - HCEL - Electrical Progress N/A Partial Pass 12-23-25: in wall electrical on demising wall approved.
12/29/2025 COT - HCBU - Building Progress N/A Partial Pass 12-29-25: okay to tape & texture warehouse side of demising wall.
06/09/2026 COT - FCON - Sprinkler - Final N/A Deferred

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00740
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/04/2026 BULD - Electrical Clearance Passed 3-4-26: okay to energize Suite 1190-panel#2. INCR clearance issued to TEP.
03/26/2026 COT - HCPL - Plumbing Intermediate Passed 3-26-26: plumbing intermediate approved.
03/26/2026 COT - HCME - Mechanical Intermediate Passed 3-26-26: mechanical intermediate approved.
03/26/2026 COT - HCEL - Electrical Intermediate Passed 3-26-26: electrical intermediate approved.
04/14/2026 COT - HCME - Mechanical Above Ceiling Passed 4-14-26: approved.
04/14/2026 COT - HCPL - Plumbing Above Ceiling Passed 4-14-26: approved.
04/14/2026 COT - HCEL - Electrical Above Ceiling Passed 4-14-26: approved.
04/27/2026 COT - HCME - Mechanical Progress Passed 4-27-26: approved.
04/27/2026 COT - HCBU - Framing Passed 4-27-26: approved.
04/27/2026 TRSP - ROW - Final/Close-Out Passed
04/27/2026 ENGR Engineering Final Passed Site is safe and complete in accordance with approved plans.
04/27/2026 COT - HCPL - Plumbing Progress Passed 4-27-26: approved.
04/27/2026 COT - HCEL - Electrical Progress Passed 4-27-26: approved.
05/01/2026 COT - HCBU - Building Progress Passed 5-1-26: approved.
05/11/2026 COT - HCME - Mechanical Final Passed 5-11-26: electrical final approved.
05/13/2026 COT - HCBU - Building Above Ceiling Passed 5-13-26: building above ceiling approved.
05/13/2026 COT - HCEL - Electrical Final Passed 5-13-26: electrical final approved.
05/13/2026 COT - HCPL - Plumbing Final Passed 5-13-26: plumbing final approved.
05/14/2026 COT - FCON - Alarm - Final Passed
05/14/2026 COT - FCON - Fire - Final Passed
05/15/2026 COT - HCBU - Building Final Passed 5-15-26: building final approved. All conditions have been satisfied- okay to app;y for C of O.
05/15/2026 COT - HCBU - CofO Passed 5-15-26: building final approved. All conditions have been satisfied- okay to apply for C of O.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
DREXEL COMMERCE CENTER SUITE 1190_V1.PDF DOCUMENTS VIEW
26E0260_1 TURNER 05 14 2026 0856-2026-05-15_V1.PDF DOCUMENTS VIEW
DREXEL TORQUE03232026_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DREXEL CC TI BUILDING 1 - SUITE 1190_V2.PDF DOCUMENTS VIEW
COMCHECK-SUITE 1190 - VLMK SIGNED_V2.PDF DOCUMENTS VIEW
DREXEL CC TI STRUCTURAL CALCULATIONS_SEALED_V2.PDF DOCUMENTS VIEW