Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0425-00655
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4811 E GRANT RD UNIT 147
Address NEW:
4811 E GRANT RD UNIT 147
Apply Date:
04/02/2025
Applicant:
Arturo Zatarain
Description:
BODY CENTRAL- Tenant improvement to an existing commercial building. The building is to remain as it is with no additional square footage added. All existing site conditions are to remain as it is.
Permit Reviews
Permit Number - TC-COM-0425-00655
Permit Status: Complete
Permit Description: BODY CENTRAL- Tenant improvement to an existing commercial building. The building is to remain as it is with no additional square footage added. All existing site conditions are to remain as it is.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2025 | COMMERCIAL REVIEW - FULL v.1 | 04/30/2025 | REQUIRES RESUBMIT |
| 07/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/21/2025 | APPROVED |
| 05/12/2025 | RESTAMP - COMMERCIAL v.1 | 05/13/2025 | APPROVED |
| 08/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/06/2025 | APPROVED |
| 05/01/2025 | COMMERCIAL REVIEW - FULL v.2 | 05/12/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0425-00655
Permit Status: Complete
Permit Description: BODY CENTRAL- Tenant improvement to an existing commercial building. The building is to remain as it is with no additional square footage added. All existing site conditions are to remain as it is.
| Date | Description | Comments |
|---|---|---|
| 05/12/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 04/08/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/13/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00655
Permite Description: BODY CENTRAL- Tenant improvement to an existing commercial building. The building is to remain as it is with no additional square footage added. All existing site conditions are to remain as it is.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/21/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 07/28/2025 | COT - FCON - Alarm - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00655
Permit Description: BODY CENTRAL- Tenant improvement to an existing commercial building. The building is to remain as it is with no additional square footage added. All existing site conditions are to remain as it is.
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | COT - LCPL - Rough Soil | Passed | ||
| 06/13/2025 | COT - LCBU - Preslab | Passed | ||
| 06/16/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 06/16/2025 | COT - LCBU - Framing | Passed | ||
| 07/17/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 07/17/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 07/21/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 07/21/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 07/21/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 07/21/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 07/24/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/28/2025 | COT - FCON - Fire - Final | Passed | ||
| 07/28/2025 | COT - LCEL - Electrical Final | Passed | 7-28-25: electrical final approved. | |
| 07/28/2025 | ENGR Engineering Final | Passed | No exterior work has been done | |
| 07/29/2025 | COT - LCPL - Plumbing Final | Passed | 7/29/2025 all corrections were made. | |
| 07/29/2025 | COT - LCME - Mechanical Final | Passed | 7/29/2025 all corrections were made. | |
| 08/06/2025 | COT - LCBU - Building Final | Passed |