Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/17/2025 |
COT - LCPL - Plumbing Final |
|
Not Ready |
Wanted Above Ceiling, but not on permit. |
| 07/28/2025 |
COT - LCPL - Plumbing Final |
|
Re-inspection required |
7-28-25: bathroom lavatories shall be no higher than 34", handrails must be no higher than 36" to the top, bathroom sign must be installed adjacent to door-see plans for location & height, restroom mirror height's not per plans, drinking fountain height not per plans, adjust all interior & exterior doors to 5 pounds, counter top height's at break room & physical therapy area not per plans, insulate hot lead on water heater with minimum of R3. |
| 07/29/2025 |
COT - LCPL - Plumbing Final |
|
Passed |
7/29/2025 all corrections were made. |