Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/12/2024
Applicant:
burak bekat
Description:
Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.

Permit Reviews

Permit Number - TC-COM-0424-00661
Permit Status: Complete
Permit Description: Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Start Date Submittal Complete Date Status  
05/16/2024 RESTAMP - COMMERCIAL v.1 05/17/2024 APPROVED Review Details
06/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/21/2024 APPROVED Review Details
06/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/27/2024 APPROVED Review Details
04/17/2024 COMMERCIAL REVIEW - LIMITED v.1 05/03/2024 REQUIRES RESUBMIT Review Details
05/06/2024 COMMERCIAL REVIEW - LIMITED v.2 05/16/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0424-00661
Permit Status: Complete
Permit Description: Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Date Description Comments
05/01/2024 AIR BALANCING REPORT IS REQUIRED.
04/17/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/01/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0424-00661
Permite Description: Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/29/2024 BULD - Electrical Clearance N/A Not Applicable Site is under current service
05/29/2024 COT - BULD - SWG Clearance N/A Not Applicable No gas service at site.
06/14/2024 COT - FCON - Alarm - Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0424-00661
Permit Description: Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Total Completed Inspections - 14
Date Description Inspector Results Comments
05/29/2024 COT - LCBU - Framing Passed
05/29/2024 COT - LCEL - Electrical Above Ceiling Passed
05/29/2024 COT - LCME - Mechanical Intermediate Passed
05/29/2024 COT - LCPL - Plumbing Intermediate Passed
05/29/2024 COT - LCEL - Electrical Intermediate Passed
05/29/2024 COT - LCPL - Rough Soil Passed
05/30/2024 TRSP - ROW - Final/Close-Out Passed
05/30/2024 ENGR Engineering Final Passed
06/17/2024 COT - LCBU - Building Final Passed
06/17/2024 COT - LCEL - Electrical Final Passed
06/17/2024 COT - LCME - Mechanical Final Passed
06/17/2024 COT - LCPL - Plumbing Final Passed
06/14/2024 COT - FCON - Fire - Final Passed
06/14/2024 COT - FCON - Sprinkler - Final Passed