Permit: TC-COM-0424-00661
Permit Details
Apply Date:
04/12/2024
Applicant:
Garett Cunningham
Description:
Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Permit Reviews
Permit Number - TC-COM-0424-00661
Permit Status: Complete
Permit Description: Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/16/2024 | RESTAMP - COMMERCIAL v.1 | 05/17/2024 | APPROVED |
06/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2024 | APPROVED |
06/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/27/2024 | APPROVED |
04/17/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 05/03/2024 | REQUIRES RESUBMIT |
05/06/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 05/16/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0424-00661
Permit Status: Complete
Permit Description: Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Date | Description | Comments |
---|---|---|
05/01/2024 | AIR BALANCING REPORT IS REQUIRED. | |
04/17/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
05/01/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00661
Permite Description: Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2024 | BULD - Electrical Clearance | N/A | Not Applicable | Site is under current service |
05/29/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | No gas service at site. |
06/14/2024 | COT - FCON - Alarm - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00661
Permit Description: Tenant Aecom. Tenant improvement created suite 300 and suite 350 from existing suite 300/350. Demolition to include existing mechanical and plumbing, and interior walls. A portion of the existing storefront is to be removed for the installation of a new exit door. New work to include new demising wall between suites 300 and 350, and to include an open office with 12 work stations. A new mini split will be added to the MDF room. No change of use. All site conditions to remain.
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2024 | COT - LCBU - Framing | Passed | ||
05/29/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
05/29/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
05/29/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
05/29/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
05/29/2024 | COT - LCPL - Rough Soil | Passed | ||
05/30/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
05/30/2024 | ENGR Engineering Final | Passed | ||
06/17/2024 | COT - LCBU - Building Final | Passed | ||
06/17/2024 | COT - LCEL - Electrical Final | Passed | ||
06/17/2024 | COT - LCME - Mechanical Final | Passed | ||
06/17/2024 | COT - LCPL - Plumbing Final | Passed | ||
06/14/2024 | COT - FCON - Fire - Final | Passed | ||
06/14/2024 | COT - FCON - Sprinkler - Final | Passed |