Permit: TC-COM-0424-00577
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
526 N WESTMORELAND AV UNIT 1
Address NEW:
526 N WESTMORELAND AV UNIT 1
Apply Date:
04/02/2024
Applicant:
Albert Hernandez
Description:
UNIT 1 - Commercial New Building Permit is for the construction of a proposed 3-unit development project. This project will consist of two buildings, one consisting of 4 beds and 4 baths and the second building consisting of a duplex building with each unit consisting of 2 beds and 2 baths. PER TEP EV METER WILL NEED TO BE CLEARED
Permit Reviews
Permit Number - TC-COM-0424-00577
Permit Status: Complete
Permit Description: UNIT 1 - Commercial New Building Permit is for the construction of a proposed 3-unit development project. This project will consist of two buildings, one consisting of 4 beds and 4 baths and the second building consisting of a duplex building with each unit consisting of 2 beds and 2 baths. PER TEP EV METER WILL NEED TO BE CLEARED
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/08/2024 | RESTAMP - COMMERCIAL v.1 | 08/12/2024 | APPROVED |
| 05/07/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/06/2024 | REQUIRES RESUBMIT |
| 07/03/2024 | COMMERCIAL REVIEW - FULL v.3 | 08/05/2024 | REQUIRES RESUBMIT |
| 08/07/2024 | COMMERCIAL REVIEW - FULL v.4 | 08/08/2024 | APPROVED |
| 04/02/2024 | COMMERCIAL REVIEW - FULL v.1 | 05/01/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0424-00577
Permit Status: Complete
Permit Description: UNIT 1 - Commercial New Building Permit is for the construction of a proposed 3-unit development project. This project will consist of two buildings, one consisting of 4 beds and 4 baths and the second building consisting of a duplex building with each unit consisting of 2 beds and 2 baths. PER TEP EV METER WILL NEED TO BE CLEARED
| Date | Description | Comments |
|---|---|---|
| 04/02/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 04/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00577
Permite Description: UNIT 1 - Commercial New Building Permit is for the construction of a proposed 3-unit development project. This project will consist of two buildings, one consisting of 4 beds and 4 baths and the second building consisting of a duplex building with each unit consisting of 2 beds and 2 baths. PER TEP EV METER WILL NEED TO BE CLEARED
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | COT - FCON - Sprinkler - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00577
Permit Description: UNIT 1 - Commercial New Building Permit is for the construction of a proposed 3-unit development project. This project will consist of two buildings, one consisting of 4 beds and 4 baths and the second building consisting of a duplex building with each unit consisting of 2 beds and 2 baths. PER TEP EV METER WILL NEED TO BE CLEARED
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2024 | COT - HCPL - Rough Soil | Passed | 9/13/24: plumbing underground passed. | |
| 09/26/2024 | COT - HCBU - Preslab | Passed | Ensure slab is properly termite treated. | |
| 11/22/2024 | COT - HCBU - Framing | Passed | ||
| 12/19/2024 | COT - HCEL - Electrical Intermediate | Passed | OK to insulate and cover walls. | |
| 12/19/2024 | COT - HCME - Mechanical Intermediate | Passed | Ok to insulate and cover walls | |
| 12/19/2024 | COT - HCPL - Plumbing Intermediate | Passed | OK to insulate and cover walls. | |
| 01/08/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 01/08/2025 | COT - BULD - SWG Clearance | Passed | Gas service in Unit #1 only. | |
| 01/17/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 02/10/2025 | BULD - Electrical Clearance | Passed | clearance is for EV meter clearance | |
| 03/26/2025 | COT - FCON - Alarm - Final | Passed | no fire alarm at the address. | |
| 03/26/2025 | COT - FCON - Fire - Final | Passed | ||
| 04/01/2025 | COT - HCEL - Electrical Final | Passed | 3-26-25, bathroom fan in bedroom 3 not working, lower thermostat to 48" o.c., all plastic on roof top/ exterior plastic must be painted or coated to protect against elements, missing hammer arrestor at dishwasher, add clamp to secure a/c whip within 12" of condenser. | |
| 03/26/2025 | COT - HCEL - Grounding/Bonding | Passed | 3-26-25, approved | |
| 04/01/2025 | COT - HCME - Mechanical Final | Passed | ||
| 04/01/2025 | COT - HCME - Venting | Passed | ||
| 04/01/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 04/04/2025 | ENGR Engineering Final | Passed | ||
| 04/09/2025 | TRSP - ROW - Notice of Completion | Passed | ||
| 04/10/2025 | COT - HCBU - Building Final | Passed |