Permit: TC-COM-0423-01148
Permit Details
Apply Date:
04/26/2023
Applicant:
Kim Olig
Description:
commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru.
Permit Reviews
Permit Number - TC-COM-0423-01148
Permit Status: Complete
Permit Description: commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/03/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/23/2023 | REQUIRES RESUBMIT |
06/08/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/22/2023 | REQUIRES RESUBMIT |
06/29/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/12/2023 | REQUIRES RESUBMIT |
09/13/2023 | RESTAMP - COMMERCIAL v.1 | 09/14/2023 | APPROVED |
08/14/2023 | COMMERCIAL REVIEW - FULL v.4 | 09/13/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0423-01148
Permit Status: Complete
Permit Description: commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru.
Date | Description | Comments |
---|---|---|
07/03/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
09/14/2023 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01148
Permite Description: commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru.
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/11/2023 | COT - HCEL - Electrical Underground | N/A | Not Applicable | Not ready. Called in wrong inspection type. Needed TEP Clearance for temporary construction power. |
11/07/2023 | COT - HCBU - Framing | N/A | Partial Pass | OK to one-side. |
02/02/2024 | COT - FCON - Fire - Final | N/A | Re-inspection required | Need all fire protection systems approved. POA permit. OK for level 2 TCO, no cooking until hood is approved. |
COT - FCON - Hood System - Final | N/A | Not Ready | Wrong inspection was requested. | |
03/04/2024 | COT - HCPL - Backwater Valve | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01148
Permit Description: commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru.
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/11/2023 | BULD - Electrical Clearance | Passed | All overhead electrical wires have been removed from SES throughout building. Electrician has installed 4 GFCI RECEPTACLES on SES for Temp power. Okay to energize meter and SES. | |
10/23/2023 | COT - HCPL - Rough Soil | Passed | Underground plumbing is complete and under a water test. Okay to shade and backfill trenches to prepare for pre-slab inspection. | |
10/25/2023 | COT - HCBU - Preslab | Passed | Subsoil is compacted where saw cuts were made. Okay to pour back concrete slab. | |
11/15/2023 | COT - HCPL - Plumbing Progress | Passed | ||
11/15/2023 | COT - HCEL - Electrical Progress | Passed | ||
11/15/2023 | COT - HCBU - Building Progress | Passed | Walls. | |
01/04/2024 | COT - HCBU - Framing | Passed | ||
01/11/2024 | COT - BULD - SWG Clearance | Passed | ||
01/23/2024 | COT - HCBU - Building Above Ceiling | Passed | Partial pending approval of the kitchen grease hood and duct, okay to cover the remaining progress areas. 2/5/ 2024. Approved per contractor letter of approval. | |
01/23/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
01/23/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
01/23/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
01/29/2024 | COT - HCEL - Electrical Final | Passed | ||
01/29/2024 | COT - HCME - Mechanical Final | Passed | ||
01/29/2024 | COT - HCPL - Plumbing Final | Passed | ||
02/02/2024 | COT - HCBU - CofO | Passed | Pima County Health Department is performing Health Department inspection during this inspection, Tucson Fire Department is onsite inspecting fire alarm and fire suppression system for kitchen hood system. Building construction is complete with all electrical, mechanical, and plumbing fixtures functioning properly. GFCI receptacles are installed where required. Kitchen multi compartment sink is plumbed correctly into floor sink. Okay to issue a Level 4 Certificate of Occupancy once all inspections are entered and approved. | |
02/09/2024 | COT - FCON - Alarm - Final | Passed | ||
02/09/2024 | COT - FCON - Fire - Final | Passed | ||
02/13/2024 | COT - FCON - Sprinkler - Final | Passed | ||
02/13/2024 | COT - FCON - Hood System - Final | Passed | ||
03/04/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
03/04/2024 | ENGR Engineering Final | Passed | CO ready | |
03/04/2024 | COT - HCBU - Building Final | Passed | ||
03/04/2024 | COT - HCEL - Outdoor Lighting | Passed |