Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 203 S WILMOT RD
Search
Parcel Attributes
Parcel | 134234120 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-1 |
Tucson Ward | Ward 2 |
Tucson Registered Neighborhood | Palo Verde Park |
Major Streets & Routes | Intersection Buffer ,Arterial or Collector |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 203 S WILMOT RD
Date - 11/23/2024 1:22 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/23/2024 1:22 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-72-28 | Drachman - Broadway Boulevard | R-5 | Withdrawn | 08/09/2011 |
Special Development Requests & Requirements
Address: 203 S WILMOT RD
Date - 11/23/2024 1:22 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000006481 | CLOSED | 03/13/2015 | N/A | Historical Information |
Permits
Address: 203 S WILMOT RD
Date - 11/23/2024 1:22 p.m.
Total Number Of Permits - (28)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TS-PRM-1223-00659 | Issued | 12/28/2023 | 08/06/2024 | Sign - Permanent | Install 8 lighted wall signs, 3 lighted directional signs, 1 clearance sign, 1 lighted ordering canopy, 1 lighted menu board | |
TF-FCP-1223-01451 | Complete | 12/27/2023 | 07/04/2024 | Fire Construction Permit | CO2 Detection System for Carbon Dioxide Systems Used in Beverage Dispensing | |
TF-FCP-1123-01300 | Complete | 11/10/2023 | 06/13/2024 | Fire Construction Permit | Installation of commercial kitchen hood fire suppression system | |
TF-FCP-1023-01220 | Complete | 10/17/2023 | 05/06/2024 | Fire Construction Permit | Tenant improvement to relocate existing 29 pendent, 2 dry pendent, and 3 upright sprinklers to accommodate the new wall and ceiling layout in renovated restaurant space. | |
DP15-0105 | Complete | 07/09/2015 | 12/13/2016 | Development Package | SITE | |
TZ-CMP-0524-00062 | Complete | 05/14/2024 | N/A | Zoning Compliance | I need a Zoning Compliance Letter for 203 S Wilmot Road, Tucson, AZ 85711. | |
TC-COM-0423-01148 | Complete | 04/26/2023 | 08/31/2024 | Commercial Building | commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru. | |
TD-DEV-0423-00212 | Complete | 04/14/2023 | 03/06/2027 | Development Package | Rev 1 - move order point and menu // Conversion of existing vacant restaurant with drive-thru to Hawaiian Bros quick-serve restaurant with drive-thru. | |
TR-UTL-0424-00749 | Void | 04/09/2024 | N/A | Right-of-Way (ROW) - Utility | (Denied - Active Permit TR-UTL-0424-0699 for Similar/Associated work at same Address. Refer to existing permit TR-UTL-0424-0699 and submit Revision or Work type Change updates through the "Revision" section of existing permit or through the use of Comment Narrative document and Updated Site and Traffic Control plan.) --- PRJ266128-1 Cox to TRENCH 2' and BORE 48' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE | |
TR-UTL-0424-00699 | Complete | 04/03/2024 | 07/28/2024 | Right-of-Way (ROW) - Utility | COX TO TRENCH 25' TO RISER DOWN WOOD POLE AND CONTINUE ONTO PRIVATE PROPERTY FOR SYSTEM TIE | |
TC-CFO-0224-00051 | Issued | 02/14/2024 | 05/16/2024 | Certificate of Occupancy | commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru. | |
TC-CFO-0224-00048 | Denied | 02/12/2024 | N/A | Certificate of Occupancy | This project needs the okay for a Temporary Certificate of Occupancy from a Building Inspector and the level of Temporary Certificate of Occupancy (TCO) for the building. Please re-request TCO. If you have any questions, please get in touch with building_official@tucsonaz.gov commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru. | |
TF-FOP-0224-00153 | Complete | 02/02/2024 | 02/07/2025 | Fire Operational Permit | Places of Assembly Permit Needed | |
TF-FCP-0124-00018 | Complete | 01/08/2024 | 08/06/2024 | Fire Construction Permit | EXPEDITE - Installation of a new Fire Sprinkler monitoring system. | |
TF-FOP-0124-00007 | Complete | 01/02/2024 | 02/07/2025 | Fire Operational Permit | General operational permit related to TF-FCP-1223-01451 | |
T02EL00464 | FINAL | 03/05/2002 | 09/02/2002 | ELECT | RECONNECT:ELECTRIC:OFFICE | |
T13EX00931 | CLOSED | 07/23/2013 | 09/21/2013 | EXCAV | INSTALL 3 WATER SERVICES ALONG WILMOT RD IN DIRT AREA. REPLACE 8 LF OF SIDEWALK (APA) | |
T15CM07660 | C OF O | 11/03/2015 | 12/12/2016 | COMBO | NEW RESTAURANT | |
T16BU00370 | FINAL | 03/09/2016 | 09/28/2016 | SPKLR | 163' OF 4" UG PIPING | |
T16BU00445 | FINAL | 03/25/2016 | 12/04/2016 | SPKLR | FIRE SPRKL | |
T16BU00836 | FINAL | 05/31/2016 | 12/04/2016 | BUILD | FIXED SYSTEM | |
T16BU00871 | WITHDRWN | 06/08/2016 | N/A | BUILD | FIRE ALARM | |
T16EX00653 | FINAL | 03/02/2016 | 05/02/2016 | EXCAV | Tricon Contracting will be installing 1-4" fire service, 1-2" meter and 1-3/4" irrigation contained within the sidewalk on the west side of the building. Approx 32 sq ft of sidewalk will be replaced. | |
T16TC00521 | EXPIRED | 03/02/2016 | N/A | BARRICAD | Tricon Contracting will be installing 1-4" fire service, 1-2" meter and 1-3/4" irrigation contained within the sidewalk on the west side of the building. Approx 32 sq ft of sidewalk will be replaced. | |
T18RW04743 | FINAL | 10/22/2018 | 12/23/2018 | ROW | This job bores 49' of 1.66" futurepath along S Wilmot Rd, Access to MH# 13104 to splice fiber. | |
T19RW00168 | FINAL | 01/11/2019 | 03/15/2019 | ROW | N.434764 - This job bores 49' of 1.66" futurepath along S Wilmot Rd, closest intersection E Broadway Blvd. Access to MH# 13104 to splice fiber. | |
T19RW01745 | FINAL | 04/01/2019 | 06/03/2019 | ROW | ACCESS MH #13104 TO SPLICE EXISTING FIBER CABLES | |
T19RW03627 | FINAL | 06/25/2019 | 11/24/2019 | ROW | ACCESS MH #13104 TO SPLICE EXISTING FIBER CABLES |
Code Enforcement
Address: 203 S WILMOT RD
Date - 11/23/2024 1:22 p.m.
Total Number Of Code Cases - (2)
Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO0723-04740 | Closed - Resolved | 07/25/2023 | 11/13/2023 | DIVERSION (W2)- MULT - chain link fence, weeds, trash and homeless. | ||
CE-VIO0923-05765 | Referred | 09/26/2023 | 09/28/2023 | CVAC / Vacant Commercial property with trash and refuse surrounding property |
Plans
Address: 203 S WILMOT RD
Date - 11/23/2024 1:22 p.m.
Total Number Of Plans - (3)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-15-0105 | Active | 07/09/2015 | 12/13/2016 | -- Commercial Water Harvesting Ordinance | SITE | |
TP-PRE-0523-00199 | Complete | 05/05/2023 | N/A | -- Pre-Application Conference | Pre-Application meeting request for an individual parking plan for redevelopment of the existing property (vacant restaurant) to Hawaiian Bros quick serve restaurant with drive thru. | |
T22PRE0209 | CLOSED | 09/06/2022 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | September 29 meeting - Site: Hawaiian Bros. Convert existing restaurant to drive-through, pick-up, carry-out, and dine-in service. |
Record Requests
Address: 203 S WILMOT RD
Date - 11/23/2024 1:22 p.m.
Total Number Of Requests - (6)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0324-01892 | Denied | 03/07/2024 | N/A | Requests | This Project is not complete related permit needs to be in completed status TD-DEV-0423-00212. Please re-request L of C/C of O once all inspections are approved or n/a. commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru. |
REQ-0324-02051 | Complete | 03/13/2024 | 03/14/2024 | Requests | commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru. |
REQ-0424-02791 | Complete | 04/11/2024 | 04/11/2024 | Requests | 30-day extension approved. If extra time is needed please request another TCO extension prior to expiration date. Delay in Bike Locker delivery. Requesting 60-day extension to ensure delivery and installment of bike locker. |
REQ-0424-02962 | Denied | 04/19/2024 | N/A | Requests | This project (TC-COM-0423-01148) Is not complete. 1. Your related Development Package, TD-DEV-0423-00212, needs to be in completed status before a LofC/CofO can be issued. Please see the following links for all your permit and development package details. https://tdc-online.tucsonaz.gov/#/permit/1a170e89-62d0-42f3-ba71-cfac0ad31acd https://tdc-online.tucsonaz.gov/#/permit/1661ed04-1bef-4b75-a55d-0cd0b063ae43 We cannot issue a CofO prior to these completions. Once passed then re-request your LofC/CofO. If you have any questions, please contact building_official@tucsonaz.gov commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru. |
REQ-0424-03122 | Complete | 04/24/2024 | 04/24/2024 | Requests | Certificate of Occupancy - commercial remodel of existing space into a Hawaiian Bros quick serve restaurant with drive thru. |
REQ-0724-04898 | Submitted - Online | 07/15/2024 | N/A | Requests | CUSTOMER CANCELLED - SO PROJECT IS NOW CANCELLED |